Len House Mill Street Maidstone Kent ME15 6YD
Listed Building Consent for restoration of Len House, rebuilding of 2 bays to Palace Avenue and associated new build works to provide a mixed-use development comprising: (i) Retention with alterations and change of use of Len House to provide commercial floorspace within the following uses - retail, financial and professional, cafe or restaurant, drinking establishment, offices, clinic or health centre, creche, or day nursery, gymnasium or indoor recreational purposes uses (within classes E, F2(a) and Sui Generis) at ground floor. (ii) Provision of 22no. residential apartments (class C3) at first floor by conversion and erection of a part rear first floor extension and provision of 58no. residential apartments (class C3) in a two storey roof extension with rooftop amenity space (iii) Associated landscaping to roof. (revised scheme to 20/501030/LBC).
Ellens Court Lady Margaret Manor Road Doddington Kent ME9 0NT
Section 73 - Application for minor material amendment to approved plans condition 2 (to allow revisions to the weatherboarding and roofing material, reduction of some areas of weatherboarding and replacement with brickwork, revisions to windows and doors, and minor internal arrangement alterations) pursuant to 18/504562/FULL for - Alterations and extensions to existing residential care home to provide 12no. bedrooms and 2no. self contained two bedroom units with associated facilities. Erection of a single storey building to provide 4no. supported living self contained apartments, a new work shop building and associated landscape works.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 19 (Co2 & Water) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
95 Priory Road North Cheam Sutton SM3 8LY
Change of use of building from mixed use class E (retail) and C3 (residential) to C3 (single family residential dwelling house), erection of a part single storey front infill extension, alterations to ground floor rear roof, ground floor front, rear and flank fenestrations.
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
Open Land Rear Of 1-51 Peckham High Road Bounded By Sumner Avenue And Melon Road, Open Land Adjacent To 59 Peckham High St And Sumner House London Southwark
Non Material amendment for planning application 20AP0433 dated 28/10/2020 for minor material amendment to planning permission 16/AP/4018 [Approval date: 15.11.2019] 'Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4; The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c to provide 44 no flats and 4 no townhouses and partial demolition of boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); part 4(Block B); a part four, part 6 storey building to provide 72 no flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level together with car parking, hard and soft landscaping, and other associated works incidental to the development' consisting of: - One change to the design of Flaxyard Block B: - Switching the balcony/terrace balustrades from glass to solid panels; - Changes to the design of Flaxyard Block C, including: - Enlargement of building footprint on floors 04 to 05; - Small number of fenestration changes; - Reduction in size of the external cycle store, but with a separate supplementary store to now be provided; - Changes to the design of Flaxyard Block D, including: - Enlargement of building footprint on floors 01 to 03; - Reduction of floorspace of the commercial unit from 247m2 to 224.5m2; - External door changes; - Changes to landscaping and car parking arrangements. The amendment are for change of Energy Strategy from CHP to ASHPs with associated plant room and roof top plant Removal of 9 dwellings from M4(2b) classification in Condition 12