All Saints Catholic School Layhams Road West Wickham BR4 9HN
Variation of Condition 16 planning permission reference 17/02964/MATAMD (dated 5 April 2018 for Amendment to planning permission ref 13/03743/FULL3 granted for the demolition of all school buildings, with the exception of the Reception building, and part demolition of the North Stable block, and erection of 48 dwellings comprising 24x 4-bed houses, 16x 1-bed flats and 8x 2-bed flats and conversion of the stable block into 2x 2-bed residential units, together with 108 car parking spaces. Associated landscaping, hardstanding areas, cycle stores and bin stores. Conversion of existing Reception building to 799sqm of office floorspace (Class b1A) together with 8 dedicated car parking spaces and the construction of 2 tennis courts, designated car park. Erection of pavilion and amenity area for community use. Amendments to position of apartment blocks on the site, extension of apartment blocks at lower ground and upper ground floor levels, demolition of north stable block and erection of 2x 2-bed houses, alterations to proposed housing mix to provide 8x 1-bed and 16x 2-bed apartments, 24x 4-bed houses and 2x 2-bed houses, alterations to windows, doors and internal layout of House Types B and C, amendments to car parking, maintenance access to Wickham Court School, removal of pavilion and internal landscaping and footpaths. Discharge of condition 16 (layout of wheelchair units) for planning permission reference 13/03743/FULL3) to allow for Plot 30 to be built to wheelchair adaptable Building Regulations Part M4(2) rather than wheelchair user Building Regulations Part M4(3).
East Oxford Community Centre Princes Street Oxford Oxfordshire OX4 1DD
Variation of condition 2 (Approved Plans), condition 3 (Material Samples), condition 4 (Timber pergola), condition 8 (Lighting details), condition 9 (Boundary fences), condition 16 (Hard and soft landscaping), condition 22 (Noise-Plant), condition 23 (Antivibration measures), condition 27 (phased risk assessment) and condition 30 (cycle parking) of planning permission 22/01128/VAR variation of conditions 3 (Material Samples), 4 (Timber pergola), 5 (Glazed link), 6 (Fenestration), 8 (Lighting Details), 9 (Boundary Fences), 14 (SBD), 16 (Hard and Soft Landscaping), 22 (Noise - Plant), 23 (Anti-vibration Measures). 27 (Phased risk assessment) and 30 (Cycle Parking) of planning permission 20/00994/CT3 (Partial demolition, refurbishment and extension to the community centre and erection of 12 residential dwellings formed of 7 one-bedroom and 5 two-bedroom apartments, with associated access and landscaping. (Amended Plans).
29 - 31 New Church Road Hove BN3 4AD
Application for variation of condition 1 of application BH2018/02126 (Demolition of existing synagogue, detached buildings providing Rabbi accommodation, synagogue social hall and childrens nursery. Erection of mixed use development comprising central single storey synagogue and four, five and six storey buildings to provide replacement childrens nursery, 2no classrooms for shared use by St Christophers school, offices, meeting rooms and cafe, underground car park and 45no residential dwellings (C3) comprising 35no flats and terrace of 10no houses to rear) to permit amendments including increase in size of the two most southerly penthouse apartments on the Eastern and Western blocks and extension of car park to reduce the number of car parking spaces beneath the shul to 3no spaces.
East Oxford Community Centre Princes Street Oxford Oxfordshire OX4 1DD
Variation of conditions 3 (Material Samples), 4 (Timber pergola), 5 (Glazed link), 6 (Fenestration), 8 (Lighting Details), 9 (Boundary Fences), 14 (SBD), 16 (Hard and Soft Landscaping), 22 (Noise - Plant), 23 (Anti-vibration Measures). 27 (Phased risk assessment) and 30 (Cycle Parking) of planning permission 20/00994/CT3 (Partial demolition, refurbishment and extension to the community centre and erection of 12 residential dwellings formed of 7 one-bedroom and 5 two-bedroom apartments, with associated access and landscaping. (Amended Plans)) to allow demolition to commence earlier, and give time for further design work to be finalised.