Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
44 Clapham Common South Side London SW4 9BU
Application for a non-material amendment following a grant of planning permission ref: 20/01436/VOC (Application under s 73 to vary condition 2 (Approved plans), condition 17 (materials), Condition 18 (construction detailing), Condition 26 (wheelchair accessible housing), Condition 37 (Bird and Bat Boxes), Condition 52 (vehicular access road), Condition 53 (Waste Transfer Unit Visibility Splays) of Planning Permission ref: 17/00605/FUL. Original description of development for 17/00605/FUL (as amended by application ref: 20/02186/NMC granted 24/07/2020): Demolition of the existing buildings and the re-development of the site incorporating the erection of six buildings comprised of basement and lower ground floor levels, ranging from four to 10 storeys above ground, landscaped gardens, public square, car parking and associated works; for a mixed use scheme comprised of a waste transfer facility at basement level, B1 office accommodation and A3 café; and the provision of residential units granted on 29.03.2018.), granted on 23.12.2021. Amendments sought: - Glass Balustrades have been replaced by metal alternatives to ensure that they meet fire strategy requirements; - Reorganisation of existing plant and AOVs. - Other minor amendments to the elevations: changes to fenestrations, doors, AOV heights, alteration of glass to metal balustrades etc.; - Provision of 3no. accessible parking bays at ground floor level and removal of substation within Block B; - Minor Amendments to layout of the PV panels layouts at roof level resulting in an uplift of 12 panels; - Minor Landscaping, including podium penetrations between Blocks to ensure compliance with the fire strategy, and other alterations resulting in uplift of 9sqm of usable amenity space for residents; - Relocation of substations
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)
7 Holbein Place Royal Borough Of Kensington And Chelsea London SW1W 8NR
Proposed development at: Strand House, 7 Holbein Place, LONDON, SW1W 8NR. Description of Development: Demolition of roof structures and fourth floor level and erection of fourth, fifth floor and part sixth floor for office (Class B1) use. Construction of roof terrace and plant enclosure. Replacement of windows and plant. Insertion of green walls. Creation of ground floor entrance. Landscaping works and other associated external works. (MAJOR APPLICATION)
Rootes Maidstone Len House Mill Street Maidstone Kent ME15 6YD
Restoration of Len House and associated new build works to provide a mixed-use development comprising: (i) Retention with alterations and change of use of Len House to provide 3,612 sqm (GIA) flexible commercial floorspace within the following uses - retail, financial and professional, café or restaurant, drinking establishment, offices, clinic or health centre, crèche or day nursery, gymnasium or indoor recreational purposes uses (within classes A1/A2/A3/A4/A5/B1a/D1/D2 of the Town & Country Planning uses Classes Order) at ground floor, 18 No. residential apartments (C3) at first floor level, together with ancillary car parking. (ii) Erection of part rear first floor and two storey roof extension to provide 62 No. new residential apartments, with rooftop amenity space. (iii) Construction of two new buildings of up to 5-storeys to provide 79 No. residential apartments (C3) with amenity space. (iv) Provision of associated car parking, open space, earthworks including demolition of hardstanding and structures, and new boardwalk to north side, de-culverting the River Len and re-utilisation existing vehicular access points from Mill Street and Palace Avenue.
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Non-material amendment to planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), change to panel layout - increasing the height of the upper-most panel to the base, addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.