Land To The East Of Linacre Road Holme Hall Chesterfield Derbyshire
Discharge of conditions: 3 (Highway improvement works), 4 (Development program), 6 (Highway Construction Management Statement/Plan), 7 (Vehicular access junctions), 8 (Construction details of the estate streets and footways), 11 (Travel plan), 12 (Junction visibility sightlines), 17 (Employment and Training Scheme), 19 (Implementation of coal mining remediation work), 21 (Construction Environmental Management Plan), 22 (Scheme for the investigation and recording of contamination), 25 (Ecological Enhancement Plan), 31 (Tree protection plan and arboricultural method statement), 36 (Proposed street scene), 37 (Contour and attenuation pond details), 38 (Detailed design and associated management and maintenance plan of the surface water for the site), 39 (Assessment to demonstrate that the proposed destination for surface water accords with the drainage hierarchy) and 40 (Additional surface water run-off during construction phase), 41 (Associated management and maintenance plan in line with CIRIA SuDS Manual C753) and 46 (Carbon release reduction scheme) of application CHE/21/00707/FUL- Erection of 301 dwellings including the provision of public open space, landscaping and associated infrastructure and works
922 - 930 Purley Way Purley CR8 2JL
Discharge of condition 4 (Construction Logistics Plan) attached to planning permission 22/01141/CONR for Variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
922 - 930 Purley Way Purley CR8 2JL
Discharge of condition 4 (Construction Logistics Plan) attached to planning permission 22/01141/CONR for variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
Land Adjoining The Gables Park Road Aldeburgh Suffolk IP15 5EX
Discharge of Condition Nos. 6, 9, 10, 12, 13, 16, 17 and 20 of DC/21/3706/FUL - Erection of detached dwelling and garage pursuant to planning permission (LPA Ref: C04/0187) - prevent the discharge of surface water from the development onto the highway, details of the areas to be provided for electric vehicle infrastructure, details of the areas to be provided for storage of Refuse/Recycling bins, detailed Arboricultural Method Statement, Construction Method Statement, i) materials and finishes; ii) hard surfacing, precise details of a scheme of landscape works (which term shall include tree and shrub planting, grass, earthworks and other operations as appropriate) and scheme for the provision and implementation of surface water drainage
Triangular Piece Of Land Bounded By Belasis Avenue/Central Avenue And Cowpen Lane (Former ICI Offices) Billingham TS23 1LA
Information to discharge conditions no6 (Tree Protection) and no8 (Construction Management Plan) of planning approval 20/1257/OUT - Outline planning permission with some matters reserved (Appearance, Landscaping, Layout and Scale) for the erection of buildings for office, research and development, manufacturing and storage (Use classes B1, B2 and B8) with associated boundary enclosure and the closure of part of Belasis Avenue. Identical application to one approved in 2019; permission sought for an extended implementation period
Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Land To The South Of Whitewebbs Lane & West Of Hotspur Way Enfield EN2 9AP
Full discharge of condition 19 (Tree Protection Plan) and Partial and retrospective discharge of condition 17 (Landscape and Ecological Management Plan) and 18 (Construction Environmental Management Plan) of 17/01178/FUL, relating ONLY to the digging of a trench to the future foundations of the consented North stand; installation of the approved pitch and related drainage infrastructure, (subject to approved details submitted in condition 14 of Ref 17/01178/FUL); and regrading of surrounding landscaped bunds, as part of the approved Formation of outdoor educational facility comprising ground works to form a nature reserve/ecological enhanced area together with erection of a single storey detached building with basement for education, sports and leisure uses, a 4-pitch Multi Use Sports Pitch with spectator stands and floodlighting, associated car parking and ancillary works. ALL parts of Conditions 17 and 18 shall be submitted and discharged in writing by the local planning authority prior to ALL other works not fore-mentioned and associated with the approved development under Ref 17/01178/FUL. (Amended description)
Vauxhall Bus Station Bondway London
Application for a non-material amendment following a grant of Planning Permission ref : 17/04741/FUL (Redevelopment of the site involving demolition of existing bus station and erection of a 3 storey building at the northern end for bus-related operational use with part retail (Use Class A1) at ground floor level, and a single storey building at the southern end for bus-related operational use. Installation of main bus station canopy; new and replacement bus shelters; alterations to existing vent shaft and lift shaft; installation of pissoir, temporary kiosk and associated works) granted 09/02/2018. Amendment sought: Phase the development into Phase 1 and Phase 2 works Amend wording to Conditions 18 (NRMM), 19 (Construction Management Plan), 20 (Temporary Bus stops) and 28 (Tree Protection) to allow for Phase 1 works to commence prior to their discharge
Foleshill Leisure Centre Livingstone Road Coventry CV6 5AR Coventry
Discharge of Conditions 3 (Sample details), 11 (Construction Method Statement), 12 (Tree Protection), 13 (SUD's) and 14 (UXO) imposed on FUL/2019/3113 for Erection of new purpose built Health Centre (Primary Care Development) and associated vehicle access and parking granted on 04/03/20