Land At Tincklers Lane Tincklers Lane Eccleston
Application to discharge conditions no.7 (biodiversity enhancement measures), no.11 (arboricultural method statement and impact assessment), no.13 (existing and proposed ground levels), no.14 (position, layout and phasing of public open space), no.15 (foul and surface water drainage strategy), no.21 (details of cycle and pedestrian routes and connections), no.27 (external facing and roofing materials), no.28 (details of fences, walls and gates), no.29 (hard landscape details) and no.30 (electric vehicle charging scheme) of outline permission ref: 20/01331/OUTMAJ (outline planning application for the construction of up to 80 dwellings with all matters reserved aside from vehicular access from Doctors Lane. The development includes public open space, structural greenspace and surface water attenuation ponds) (Appeal ref: APP/D2320/W/21/3272310)
Land Adjacent To No 38 Eythrope Road Stone Buckinghamshire HP17 8PG
Proposed non-material amendment sought to permission for (Approval of Reserved Matters pursuant to outline permission 19/00097/AOP for appearance, appearance, landscaping, layout and scale of a residential development of 5 dwellings and discharge of conditions 1 (details of layout) 4 (slab levels) 5 (hard and soft landscaping) 7 (archaeological) 11 (details of dropped kerb) 12 (details of parking and manoeuvring) 14 (construction transport management plan) 15 (trees) 18 (whole life maintenance plan) 23 (details of screen, boundary, fences, walls) 24 (slab levels) and 25 (details of means of foul and water drainage) relating to 20/01342/ADP) to rectify clerical errors in the description of the approved reserved matters application.
Land Adj To 38 Eythrope Road Stone Buckinghamshire HP17 8PG
Approval of Reserved Matters pursuant to outline permission 19/00097/AOP for appearance, appearance, landscaping, layout and scale of a residential development of 5 dwellings and discharge of conditions 1 (details of layout) 4 (slab levels) 5 (hard and soft landscaping) 7 (archeological) 11 (details of dropped kerb) 12 (details of parking and menoevuring) 14 (construction transport management plan) 15 (trees) 18 (whole life maintenance plan) 23 (details of screen, boundary, fences, walls) 24 (slab levels) and 25 (details of means of foul and water drainage)