1 Elgin Road Wallington SM6 8RE
Erection of a two-storey side extension to form an end of terraced two-storey house to provide additional two self-contained residential flats and side extensions to existing four residential flats, including a subdivision of the rear garden area with boundary fence to the rear, associated soft and hard landscaping and provision of refuse storage at the front.
East Oxford Community Centre Princes Street Oxford Oxfordshire OX4 1DD
Variation of condition 2 (Approved Plans), condition 3 (Material Samples), condition 4 (Timber pergola), condition 8 (Lighting details), condition 9 (Boundary fences), condition 16 (Hard and soft landscaping), condition 22 (Noise-Plant), condition 23 (Antivibration measures), condition 27 (phased risk assessment) and condition 30 (cycle parking) of planning permission 22/01128/VAR variation of conditions 3 (Material Samples), 4 (Timber pergola), 5 (Glazed link), 6 (Fenestration), 8 (Lighting Details), 9 (Boundary Fences), 14 (SBD), 16 (Hard and Soft Landscaping), 22 (Noise - Plant), 23 (Anti-vibration Measures). 27 (Phased risk assessment) and 30 (Cycle Parking) of planning permission 20/00994/CT3 (Partial demolition, refurbishment and extension to the community centre and erection of 12 residential dwellings formed of 7 one-bedroom and 5 two-bedroom apartments, with associated access and landscaping. (Amended Plans).
East Oxford Community Centre Princes Street Oxford Oxfordshire OX4 1DD
Variation of conditions 3 (Material Samples), 4 (Timber pergola), 5 (Glazed link), 6 (Fenestration), 8 (Lighting Details), 9 (Boundary Fences), 14 (SBD), 16 (Hard and Soft Landscaping), 22 (Noise - Plant), 23 (Anti-vibration Measures). 27 (Phased risk assessment) and 30 (Cycle Parking) of planning permission 20/00994/CT3 (Partial demolition, refurbishment and extension to the community centre and erection of 12 residential dwellings formed of 7 one-bedroom and 5 two-bedroom apartments, with associated access and landscaping. (Amended Plans)) to allow demolition to commence earlier, and give time for further design work to be finalised.