Rear Of 260 Knight's Hill London SE27 0QA
Variation of condition 2 (approved plans) of Planning Permission Ref: 20/02581/FUL (Erection of 2 x 3-storey terraces with roof top amenity space to provide 8 dwellinghouses and erection of a detached 2-storey building with basement to provide 130sqm of office (Use Class B1(a)) and a self-contained flat at first floor (Use Class C3), together with the provision of car parking spaces, cycle parking, refuse storage and landscaping. This application is a DEPARTURE APPLICATION: The proposed development is a departure from Policy E4 and Policy E7 of the London Plan 2021.) granted on 26.08.2021 Variation Sought: The revision is an alteration to part of the north facing wall of Block C at first floor level so that it is vertical on the boundary. The alterations are minor adjustments to remedy inconsistencies in the original design of the building known as Block C which consists of an office at ground and basement and an apartment at first floor.
51 Blakes Lane New Malden KT3 6NS
Details required for Conditions 3 (External Materials), 5 (Hard and Soft Landscaping), 6 (Renewable Energy), and 9 (Boundary Treatment) of planning permission 19/02817/FUL (Variation of Condition 2 (Approved Plans) of Planning Permission 18/14856/FUL (Demolition of existing house. Erection of a two storey residential development (with roof space accommodation) to provide 2 x 2 bed and 2 x 3 bedroom flats with associated parking, landscaping and amenity.) for erection of additional rear dormer to south elevation, additional obscured glazed window to side elevation and removal of 2 no. roof lights and installation of 1 no. roof light)
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendment to include removal of chimneys at plots 44, 88, 98, 130 and 134
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendments include removal of chimneys to plots 83, 84, 85 and 61