Search Results

Found 2 planning applications

20/06991/FULL | Application for full Planning Permission

70 - 72 Piccadilly London W1J 8HP

Variation of Conditions 1, 11 and 15 of planning permission dated 4 March 2020 (RN: 18/10021/FULL) for, 'Part demolition of, and extensions to, the existing buildings, including a 2 storey roof extension; the refurbishment of the existing and creation of new office (Class B), hotel (Class C1), retail (Class A1 - A5) and Leisure and non-residential institutions (Class D1 - D2) floorspace with ancillary functions; basement refurbishment works; the erection of a 5 storey pavilion on the corner of Piccadilly and Dover Street; Installation of plant at roof level; hard and soft landscaping works as part of an improved public realm offering at Dover Yard and pedestrian route between Dover Street and Berkeley Street, including the creation of additional retail outlets; and other ancillary works. (Site includes 1 - 7 Berkeley Street)'; Namely: to amend approved drawings to deliver a contractable canopy to the east side of Dover Yard, addition of a canopy to the hotel entrance at Berkley Street, expansion of the green wall to Berkeley Street and Dover Yard, revised landscaping scheme for Dover Yard, introduction of a small retail kiosk at Dover Yard Passage, amendments to lift overrun and plant screen, and minor façade amendments to the Annex Building (all amendments to drawings approved under Condition 1); to support the allowance of an experiential car retail showroom use (sui generis) within the commercial units (amendments to Condition 11); and, to allow the placement of furniture in Dover Yard to be subject to a Management Plan (amendments to Condition 15).

Local Authority
City of Westminster
Type
Full planning consent (Application for full Planning Permission)
Decision
(20/06991/FULL)
Application Received
03/11/2020
Application Validated
03/11/2020
Extension Erection Demolition Variation Amendment Roof Landscaping Residential Office Shop
20/AP/2601 | Variation/discharge of Legal Agreement

London South Bank University 103 Borough Road London Southwark SE1 0AA

Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".

Local Authority
Southwark Council
Type
Other (Variation/discharge of Legal Agreement)
Decision
(Agreed - for App Types VLA & VNMC)
Application Received
08/09/2020
Application Validated
08/09/2020
Extension Alteration Erection Demolition Variation Amendment Roof Development Landscaping Shop