Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
University Of Cumbria Bowerham Road Lancaster Lancashire LA1 3JD
Demolition of buildings including Sarah Witham Thompson, Gressingham and Melling Halls, Black Box Theatre, Old Dining Room and the Long Corridor and erection of a 4 storey Extra Care residential building (use class C3), partial demolition, conversion and change of use of the Art Studio from education facility (use class D1) to ancillary space associated with the Extra Care residential building and change of use and conversion of Barbon Hall and Hornby Hall from education facility (use class D1) to provide affordable residential apartments (use class C3) with associated landscaping, parking, access and service infrastructure (pursuant to the variation of conditions 2 and 26 on planning permission 20/00554/FUL to enlarge the building footprint, amend the site layout, fenestration and car parking (including reduction by one space) and addition of lift overruns and a safety railing to the roof on the extra care building and to update the Energy Statement)