Search Results

Found 11 planning applications

22/04903/FULL | Application for full Planning Permission

20 Carlton House Terrace London SW1Y 5AN

Variation of Conditions 31 and 32 of planning permission dated 30 March 2022 (21/07642/FULL) for the demolition of existing mansard roof and roof level plant and construction of two storey vertical roof addition with extensions at fourth, fifth, sixth and seventh floor levels for additional office (Class B1) floorspace. Use of the lower ground and basement level for flexible/alternative office (Class B1)/retail (Class A1)/leisure uses (Class D2); car parking, cycle parking, ancillary office uses and mechanical plant. Alterations to the existing building including new windows and entrance, new terraces to eighth and tenth floor levels and new plant enclosure at roof level and associated works; and amendments to car parking provision (retention of the public car park), alterations to the cycle parking provision and basement layouts and reduction in flexible commercial floorspace; namely, to amend the wording of Conditions 31 and 32 to require the landscaping of the first floor terrace to be carried out in accordance with the submitted details.

Local Authority
City of Westminster
Type
Full planning consent (Application for full Planning Permission)
Decision
(22/04903/FULL)
Application Received
20/07/2022
Application Validated
26/07/2022
Extension Alteration Demolition Variation Amendment Construction Roof Landscaping Windows Office Shop
21/06822/FULL | Application for full Planning Permission

80 New Bond Street London W1S 1SB

Variation of Conditions 1, 14, and 20 of planning permission dated 28 June 2021 (RN: 20/08230/FULL) for, 'Demolition and rebuilding of 3-4 Dering Street to provide a four storey plus basement building with a plant enclosure above. Extensions and refurbishment of 325-329 Oxford Street and 80 New Bond Street to provide an eight storey plus basement building; re-alignment of the facade along the Oxford Street frontage above first floor level to match neighbouring building; creation of terraces at seventh and eighth floor levels; alterations to the facade on the Oxford Street and New Bond Street frontages including the provision of a double height shopfronts, the provision of additional accesses and other associated external works, all in connection with the use of the building for retail and offices purposes (Class E)'; NAMELY, to allow amendments to the external facade design, additional landscaping details and amendments to the internal layout at basement level. (Application under Section 73 of the Act).

Local Authority
City of Westminster
Type
Full planning consent (Application for full Planning Permission)
Decision
(21/06822/FULL)
Application Received
05/10/2021
Application Validated
05/10/2021
Extension Alteration Demolition Variation Landscaping Office Shop
21/AP/1144 | Approval of Details

1 Bank End London Southwark SE1 9BU

Details of Condition 16- Landscaping as required by planning permission 19/AP/1649 dated 02/10/2019 for Variation of condition 2 (approved plans) of planning permission 15/AP/3066 for 'Redevelopment of 1 Bank End, including reuse of railway arches and rebuilding and extension of the rear of Thames House, Park Street (behind retained facade); remodelling of Wine Wharf building on Stoney Street and development of a two storey building at 16 Park Street, all to provide a development reaching a maximum height of 6 storeys (maximum building height 27.419m AOD) comprising retail units (flexible class A1 shops, A3 cafes/restaurants and A4 drinking establishments use) at ground and first floor levels, a gallery (Class D1 use) at ground floor level, office floorspace (Class B1 use) at ground up to fifth floor level, a cinema (Class D2 use) at ground floor and basement level, associated cycle parking spaces at basement, associated refuse and recycling with new public access routes and public open space' to make minor-material amendments including: Alterations to internal retail layouts dictated by an updated Fire Strategy, Alterations to the west elevation of Building 02, Alterations to the east elevation of Building 02 dictated by change of first floor use; and Alterations to elevations of Building 04.

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
01/04/2021
Application Validated
06/04/2021
Extension Alteration Variation Development Landscaping Office Shop House Remodelling
20/AP/0677 | Approval of Details

74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

Details of Condition 6 - scale 1:5, 1:10 or 1:20 section detailed-drawings of the elements required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts',

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
04/03/2020
Application Validated
09/03/2020
Extension Alteration Erection Demolition Variation Landscaping Windows Residential Office Shop Fence Boundary
16/03010/S7301 | Section 73 Application

Blacker Hall Farm Shop Ltd Branch Road Calder Grove Wakefield WF4 3DN

Variation of condition 2 (approved plans) of application reference number 16/03010/FUL dated 1.06.2018 (Restoration of existing malthouse and change of use to offices, extension to existing farm shop, extension to existing cafe barn, extension to existing production unit and associated landscaping and highways alterations) to revise previously approved details for the malthouse phase of development of the site including details required to bring this phase forward with additional details of the café barn extension phase of development.

Local Authority
Wakefield Council
Type
Removal/variation of conditions (Section 73 Application)
Decision
Approved (Application Approved)
Application Received
11/12/2020
Application Validated
05/03/2021
Extension Alteration Variation Development Agricultural Landscaping Office Shop
21/AP/0989 | Approval of Details

30 Southbank Central Stamford Street London Southwark SE1 9LS

Details of Condition 1 (Landscaping details), as required by planning permission 15/AP/2511 (Variation of condition 2 (approved plans) of planning permission 11/AP/3797 (granted on 13 March 2012) for the refurbishment and recladding of the tower and podium buildings, erection of six additional storeys to the tower for residential use and change of use of floors 11 to 30 of the tower from offices to residential, erection of a series of extensions and additions for office use and creation of retail space, pool and gym on the ground floor, and formation of a new pedestrian route linking Stamford Street to Upper Ground. The amendments consist of: i. alteration and enlargement of the Stamford Street offices ii. alteration and enlargement of the tower office entrance on Hatfields; iii. introduction of new internal accommodation stair to tower; iv. extension of retail units 4 (fronting Hatfields) and 7 (within new pedestrian route); v. subdivision of retail unit 5 (within new pedestrian route); vi. revised design and layout for the 7th floor Stamford Street office roof terrace.)

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
23/03/2021
Application Validated
24/03/2021
Extension Alteration Erection Variation Roof Landscaping Residential Accommodation Office Shop
19/AP/7611 | Approval of Details

74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

Details of Condition 3 - External materials, as required by planning permission 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
20/12/2019
Application Validated
23/12/2019
Extension Alteration Erection Demolition Variation Landscaping Windows Residential Office Shop Fence Boundary
2020/01967/OBS | Observations to Other Borough

Peabody Estate St Johns Hill London SW11 1TY

Details Landscape General Arrangement plan, Tree Planting Plan, Hard Landscape, Plan, Walls& Boundaries Plan, Soft Landscape Schedule and Landscape Specifications pursuant to conditions 3 and 13 of planning permission dated 15/01/2019 ref 2017/5837 (Variation of condition 15 (in accordance with approved drawings) pursuant to planning permission dated 18/10/2012 ref 2012/1258 (Demolition of all existing buildings. Erection of 5 buildings of 4-12, 4-8, 7, 5-7 and 4-6 storeys to provide 527 residential units (135 x 1 bed, 261 x 2 bed,105 x 3 bed and 26 x 4 bed), with approx. 7800 square metres of private, communal & public space & public routes. Car parking (121 spaces within basement and 15 spaces at grade), 687 cycle parking spaces plus approximately 530 square metres of community space in the centre of the site and approximately 569 square metres of commercial space (classes A1-A5 (retail, financial and professional services, cafe/restaurant, take away, pub/bar and/or B1 office use) at the northern end of the site. Vehicular accesses from Comyn Rd and Eckstein Rd and emergency access from St John's Hill and Strath Terrace.) to allow: Plot 2: two storey increase allowing an additional 23 flats and change in tenure to older persons social rent only, removal of basement carparking; Planning Portal Re: PP-08149002 Plot 3: two storey increase to the centre tower allowing an additional 11 flats and change in tenure to private rent only; Plot 6: one storey increase allowing three additional flats; Plot 7: four additional flats (through internal reconfigurations); Plot 8: loss of one flat; Plot 9: One storey increase to the western section, extension of southern section facing Comyn Rd to close the building gap and removal of corner feature to Comyn Rd to allow 31 additional flats, inclusion of parking below podium level; General alterations to fenestration and finishes to accommodate changes and reconfiguration of carparking resulting in a loss of 28 spaces. Overall reco

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
31/07/2020
Extension Alteration Erection Demolition Variation Landscaping Windows Residential Trees Flat Office Shop
195157VAR | Variation of Condition

St Bernards Hospital Uxbridge Road Southall Middlesex UB1 3HW

Minor material amendment (S.73) to vary condition no.41 (use of the chapel)) pursuant to planning permission reference 164907VAR dated 31/05/2017 for 'Application for a Minor Material Amendment/S73 (Variation of condition 4 approved plans) amendments to the approved detailed landscape scheme of planning permission P/2012/5040 dated 23/07/2013 (amended by PP/2014/5010, PP/2014/4645, P/2014/6390, PP/2015/3928 and 161549VACS) for 'Hybrid planning application: Outline element, with all matters reserved, for the demolition of Windmill Lodge, five buildings containing flats and bowling green pavilion and the re siting of an electricity substation, in conjunction with the erection of three buildings of up to 9 storeys high containing 260 residential units comprising private and affordable units and up to 803sq. metres of floorspace in B1/D1 use and 67 sq. metres of floorspace in A1/A3/B2 use, associated hard and soft landscaping including the removal of trees, surface and basement car parking, cycle parking, servicing, public realm, access and other associated works including the provision of a pedestrian access to Uxbridge Road and alteration to vehicular access on to the hospital access road to the East. Detailed elements for a) the demolition of a single storey extension to the North side and a two storey extension in the south East corner and internal and external alterations in conjunction with the change of use of the listed gatehouse from offices to a retail unit (Use Class A1), cafe (Use Class A3), concierge accommodation (sui generis) and offices (Use Class B1) b) internal and external alterations in conjunction with the conversion of the listed North House in 6 one-bed flats, with external bin store and cycle store, associated hard and soft landscaping; access, 3 car parking spaces and associated works, c) Erection of a three storey building to provide 4 residential....' Variation to allow the Chapel to be used for a mix of Use Classes E and F.2 (b).

Local Authority
Ealing Council
Type
Removal/variation of conditions (Variation of Condition)
Decision
(Draft Decision Waiting Legal Agreement)
Application Received
04/12/2019
Application Validated
04/12/2019
Extension Alteration Erection Demolition Variation Amendment Conversion Landscaping Residential Trees Flat Accommodation Office Shop House
19/AP/5993 | Approval of Details

74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
23/10/2019
Application Validated
24/10/2019
Extension Alteration Erection Demolition Variation Construction Landscaping Windows Residential Office Shop Fence Boundary