Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
68 Mervan Road London SW2 1DU
Erection of a single storey ground floor rear extension with the formation of a first floor roof terrace, including the replacement of the outbuilding with a single storey home office. Alterations to hard/soft landscaping, boundary treatment and creation of a vehicular crossover.
Dolphin House Ashurst Drive Cheadle Heath Stockport SK3 0XB
Discharge of Conditions 3 (Testing and Validation of Imported Materials) and 6 (Tree Planting and Biodiversity Enhancement Measures) of Planning Permission reference DC/072506 for Elevational alterations to Dolphin House, including works to create a brick and glazed entrance area, insertion of doors, installation of externally mounted metal escape stair, new access ramp, new ballustrading to existing access ramp, siting of sprinkler tank and pump house upon area of car park, installation of roof mounted plant, including a 130 square metre plant area, hard surface landscaping, segregated recycling and waste management area, erection of boundary treatments, and associated works, in association with the use of the building for Use Class B1 offices, research and development, processes and ancillary functions.