Development Site At Former 300 Harrow Road London
Variation of condition 1 of planning permission dated 23rd October 2020 (RN:19/09638/FULL) for the Demolition of existing community centre (Use Class D1) and nursery (Use Class D1) buildings and associated structures and replacement with three blocks (Blocks A, B and C) to create residential dwellings (Use Class C3), office floorspace (Use Class B1), cafe (Use Class A1), replacement community space (Use Class D1) and replacement nursery (Use Class D1). Landscaping and public realm alterations (including to the base of Wilmcote House); provision of car parking and cycle parking, refuse storage; provision of new boundary treatment; alterations to services; plant and associated works from RN:19/09638/FULL. Namely, to allow alterations to the tenure to 100% affordable housing, internal alterations including removal of built in wardrobes, alterations to windows and doors (internal and external), amend curtain wall panels, alter rainwater pipe location, new canopies to entrances, alterations to materials to part of nursery, alterations to heat network, elevation changes, alterations to Harrow Road public realm.
Cemetery House Church Street London N9 9HP
Details pursuant to ref: 18/04864/FUL: Construction Management Plan (3), surfacing materials (5), boundary treatments (6), external materials (7), cycle parking (8), waste management facilities (9), landscaping (10), Bat Survey (11), biodiversity enhancements (17), for the demolition of the former Coach house and erection of terrace of 4 x 2 bed single family dwellings with amenity space together with part demolition and renovation of Cemetery house to provide Offices at ground and first floor level involving lowering and extension to existing basement, single storey rear extension with internal terraces, rear dormers with rooflights, replacement windows and alterations to existing lightwells and creation of an additional lightwell together with the construction of new hardstanding with garages ,car parking spaces, installation of fencing, new site access to south boundary and access gates for pedestrians and vehicles.