St Philips Church 87 Aber Road Cheadle Stockport SK8 2EP
Discharge of Conditions 2 (Construction Method Statement), 3 (Surface Water Drainage Strategy), Condition 5 (Contamination Remediation Validation), 6 (Access Details), 7 (Car Parking Facilities), 8 (Footway Reconstruction), 9 (Electric Vehicle Charging Points), 10 (Cycle Parking), 11 (Addendum Noise Report), 14 (Tree Planting Details), 15 (Materials), 16 (Hard and Soft Landscaping) and 20 (Lighting Scheme) of planning permission reference DC/077299 for Demolition of church buildings and erection of 6 dwellings (2 detached dwellings and 2 pairs of semi detached dwellings) including vehicle parking, vehicle charging points, cycle and bin storage, boundary treatments and alterations to access
89 Hyde Road South Croydon CR2 9NS
Discharge of condition 5 (Construction Logistics Plan) for Demolition of existing two-storey dwelling and erection of a four/five storey (including excavation and lower ground level) building comprising of 9 residential flats, hard and soft landscaping, boundary treatment, land level alterations, undercroft and external car parking, private/communal/play space and internal refuse/cycle storage dated 22.02.2021
89 Hyde Road South Croydon CR2 9NS
Discharge of Condition 5 (Construction Logistics Plan) pursuant to application reference: 20/00108/FUL dated 22.02.2021 Demolition of existing two-storey dwelling and erection of a four/five storey (including excavation and lower ground level) building comprising of 9 residential flats, hard and soft landscaping, boundary treatment, land level alterations, undercroft and external car parking, private/communal/play space and internal refuse/cycle storage.
Coombe Bank 6 Church Road Kenley CR8 5DU
Discharge of Conditions 3 (Construction Logistics Plan (CLP) and 4 (Bat License) of planning permission 20/03852/FUL (Demolition of existing dwellinghouse and erection of a part three, part four storey building comprising 7 self-contained flats and a three storey semi detached pair (two dwellings) including excavation; hard and soft landscaping; alterations to existing crossover and new crossover for proposed access drive for vehicular parking; communal/private/play space boundary treatment; refuse and cycle provision and external alterations)