Land South Of Park Avenue Park Avenue Southall UB1 3AD
Application for a Minor Material Amendment (S73.a) for the variation of conditions 8 (Solar Glare), 20B (Overheating and Cooling analysis), 20F (District Heat Network), 36 (Extraction and Odour Control system), 37A (Transport/commercial/industrial/cultural noise- Sound Insulation), 38A (External noise) and 45 (Extract system) of planning permission ref: 216991FULR3 dated 02/03/2023 for: Demolition of existing buildings and the erection of 5 blocks of between 5 and 25 storeys to provide affordable and market Class C3 dwellings and flexible Classes E and F2 floorspace, public realm, landscaping, amenity/play space, alterations to vehicle and pedestrian access, car and cycle parking and refuse storage, associated works including roof level plant. Phased Development. (Amended description and plans concerning phasing, dwelling numbers and mix, commercial space). (Regulation 3 Application by Paragon Asra Housing involving land owned by London Borough of Ealing). Variation seeks to change the wording of the conditions 8, 20B, 20F, 36, 37A, 38A and 45 to enable works to progress on site and allow concrete frame to be erected.
65 Hampden Road Kingston Upon Thames KT1 3HG
Non Material Amendment to planning permission 20/02014/FUL (Application under Section 73 for a variation of Condition 2 (Approved Plans) of Planning Permission ref: 19/00020/FUL (Demolition of existing industrial buildings and erection of replacement residential accommodation containing 79 flats, comprising of 1, 2, 3 and 4 bedroom units, a Police Office, Use Class B1 (a), residents work hub incorporating 47 car parking spaces, 184 private cycle parking spaces and 6 public cycle spaces and refuse, recycling and plant stores, a private and communal amenity spaces, play space and hard/soft landscaping) dated 23/01/2020, to allow for alterations to internal/external configurations to lower ground, upper ground, first to fifth and roof floors) for the variation of conditions 1, 10, 11, 17, 28 to include phasing plan within the extant approved conditions and to adjust the timing for submission of details and alterations of the description of development to include reference to phasing.