20 Carlton House Terrace London SW1Y 5AN
Variation of Conditions 31 and 32 of planning permission dated 30 March 2022 (21/07642/FULL) for the demolition of existing mansard roof and roof level plant and construction of two storey vertical roof addition with extensions at fourth, fifth, sixth and seventh floor levels for additional office (Class B1) floorspace. Use of the lower ground and basement level for flexible/alternative office (Class B1)/retail (Class A1)/leisure uses (Class D2); car parking, cycle parking, ancillary office uses and mechanical plant. Alterations to the existing building including new windows and entrance, new terraces to eighth and tenth floor levels and new plant enclosure at roof level and associated works; and amendments to car parking provision (retention of the public car park), alterations to the cycle parking provision and basement layouts and reduction in flexible commercial floorspace; namely, to amend the wording of Conditions 31 and 32 to require the landscaping of the first floor terrace to be carried out in accordance with the submitted details.
The Bobath Centre 250 East End Road London N2 8AU
Amendment to include, Variation of conditions 1 (The Approved Plans), 9 (Cycle storage), 11 (Site Enclosure), 15 (Door and Window Details), 17 (Noise Report), 19 (Grilles, lighting, alarms), 20 (Acoustic Screening to Roof, Design) and 22 (Acoustic Screening to Roof, Materials) of planning permission reference 19/3899/S73 dated 10/09/2019 for 'Partial demolition of existing buildings, including rear extensions and link building and removal of external ramps and other additions. Construction of new extensions to the rear and west of the retained existing buildings and creation of external playground. Internal works of repair, maintenance and restoration to listed buildings. Removal of existing hardstanding and creation of new access road, car parking and site wide landscaping.' Amendment to include, alterations to the form of cycle storage, additional sections of fencing and gates to front of building, revisions to glazed entrance screen, details to roof plant and acoustic and visual screens