Century House 31 - 32 Soho Square London W1D 3AP
Demolition and redevelopment of 31- 32 Soho Square (part retained facade) and 65-66 Frith Street (replacement building comprising of two basement levels, ground and six upper levels of accommodation), alterations and works to 22-25 Dean Street including the erection of a rear extension at 1st and 2nd floors, alterations and works to 10 Chapone Place including the erection of an extension at 3rd floor level. Proposals include the enlargement and improvement to Chapone Place to provide a new public realm and route through the site linking Soho Square and Dean Street. Proposals will provide new, reconfigured and additional B1 (office) accommodation, flexible A1/A3 (retail/restaurant) units, A1 (retail) units, enlarged A3 (restaurant) unit and a flexible D1/D2 (non- residential institutions/assembly and leisure) unit' (Revision to original scheme including reduction of the overall height of the proposed building encompassing 31-32 Soho Square and 65-66 Firth Street by one upper storey; and change in roof extension profile from a tiered approach to a slate clad mansard type roof, retention of part of the brick existing facade of 31-32 Soho Square).
47 Great Marlborough Street London
Variation of Condition 1 of planning permission dated 06 December 2017 (RN: 17/05944/FULL) for erection of a rear and roof extensions including partial demolition to provide additional Class B1 office floor space and residential apartment (Class C3), and dual/alternative use of part basement and part ground floor as a retail shop (Class A1) or restaurant (Class A3). NAMELY, to enable the use of part fourth floor as residential accommodation (Class C3).
30 Southbank Central Stamford Street London Southwark SE1 9LS
Details of Condition 1 (Landscaping details), as required by planning permission 15/AP/2511 (Variation of condition 2 (approved plans) of planning permission 11/AP/3797 (granted on 13 March 2012) for the refurbishment and recladding of the tower and podium buildings, erection of six additional storeys to the tower for residential use and change of use of floors 11 to 30 of the tower from offices to residential, erection of a series of extensions and additions for office use and creation of retail space, pool and gym on the ground floor, and formation of a new pedestrian route linking Stamford Street to Upper Ground. The amendments consist of: i. alteration and enlargement of the Stamford Street offices ii. alteration and enlargement of the tower office entrance on Hatfields; iii. introduction of new internal accommodation stair to tower; iv. extension of retail units 4 (fronting Hatfields) and 7 (within new pedestrian route); v. subdivision of retail unit 5 (within new pedestrian route); vi. revised design and layout for the 7th floor Stamford Street office roof terrace.)