Land North Of A14 Rougham East Bound Rougham Suffolk
Reserved Matters Application - submission of details under DC/16/2825/OUT - means of appearance, landscaping, layout, scale for the construction of commercial development comprising two units of light industrial (E)giii)) and storage and distribution (B8) with ancillary offices, together with associated infrastructure including vehicle parking, yard parking, drainage and landscape planting
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,196m² GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B). The erection of 1no. building totalling circa 3,145m2 GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1 (Design Code Compliance), G2 (Compliance Checklist), G7 (Construction Management Plan), G10 (Wayfinding), P1 (Plot Landscaping), P2 (Access), P3 (Parking), P5 (Surface Water Drainage), P6 (Foul Drainage), P10 (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Outside District
Hybrid planning application: Full permission sought for demolition of two dwellings, outbuildings and related structures; creation of access from the A605; highway works to Oundle Road.Junction 17 of the A1(M); and associated site infrastructure works compromising groundworks, internal access roads, strategic landscaping, creation of development plateaus and diversion of underground water pipe. Outline permission sought for the construction of industrial distribution units (use class B8) with ancillary offices (use class e(g)). All matters reserved except for access. Location - Land North Of Peterborough Road Haddon.
Land South West Of Hedon Bypass Hedon East Riding Of Yorkshire HU12 8AA
Hybrid planning application for the development of land at Hedon Haven comprising: 1. An application for full planning permission for the construction of a new estate road between Hull Road (A1033) and Paull Road, together with associated infrastructure and works; and2. An application for outline planning permission for the construction of up to 394,839sqm of employment floorspace (Class B2 (Industrial) / Class B8 (Storage & Distribution)), including ancillary office (Class B1) floorspace, and up to 5,111sqm of flexible commercial floorspace, to include Classes A1-5 (Retail), B1 (Business), C1 (Hotel), D1 (Non-Residential Institutions), D2 (Assembly and Leisure) and other ancillary sui generis uses, and associated landscaping and infrastructure
596-608 Old Kent Road And Land At Livesey Place London SE15 1JB
Mixed-use redevelopment comprising the demolition of all existing buildings and structures (listed mural to be removed and stored prior to demolition, and incorporated into proposed development); construction of three buildings arranged around a central plinth ranging in height from 10 to 38 storeys (maximum height +144.2m AOD) above single basement, ground and mezzanines floors, to provide a range of uses including 372 residential units (Use Class C3), place of worship (Use Class D1), retail (Use Classes A1-A4), and office / light industrial (Use Classes B1(a)/B1(c)); means of access, public realm and landscaping works, parking and cycle storage provision, energy centre / plant and servicing areas, and associated ancillary works. This application represents a departure from strategic policy 10 'Jobs and Businesses' of the Core Strategy (2011) and Saved Policy 1.2 'Strategic and Local Preferred Industrial Locations' of the Southwark Plan (2007) by virtue of proposing to introduce residential accommodation in a preferred industrial location. An associated Listed Building Consent Application has been submitted under reference 18/AP/3285 THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT (ES) submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. The ES can be viewed on the Council's website. A paper copy of the ES may be obtained for a charge of £500.00 from: CBRE Ltd. Environmental Planning & Assessment St Martins Court 10 Paternoster Row London EC4M 7HP Alternatively, an electronic copy can be obtained for £10.00 by contacting CBRE at the above address. Charges for paper and electronic copies of the ES are made in accordance with Regulation 24 of the EIA Regulations 2017.
Land at The Rear Of The Old Red Lion High Street Great Missenden Buckinghamshire HP16 0AN
Approval of condition 15 (Construction Method Statement) of planning permission CH/2017/1943/FA - Demolition of three four-bed houses, a disused industrial building (Use Class B2) and 20 garages, removal of spoil and trees from the rear of the site. Development of 34 residential dwellings comprising 25 houses and 5 flats, with associated landscaping tree replacement, car parking and internal shared surface road. Change of use of the upper storeys of The Old Red Lion (62 High Street) from office to residential to provide 4 flats. Ground floor building line amendment to southern elevation of The Old Red Lion (62 High Street) to remove 700mm at ground floor only to provide improved visibility onto the High Street. Amendments to Forge Cottage on Missenden Mews to relocate front door, relocate car parking space and provision of new private amenity space within the site.
Land at The Rear Of The Old Red Lion High Street Great Missenden Buckinghamshire HP16 0AN
Approval of conditions 3 (Construction Phase Plan) & 25 (Energy statements) of planning permission CH/2017/1943/FA - Demolition of three four-bed houses, a disused industrial building (Use Class B2) and 20 garages, removal of spoil and trees from the rear of the site. Development of 34 residential dwellings comprising 25 houses and 5 flats, with associated landscaping tree replacement, car parking and internal shared surface road. Change of use of the upper storeys of The Old Red Lion (62 High Street) from office to residential to provide 4 flats. Ground floor building line amendment to southern elevation of The Old Red Lion (62 High Street) to remove 700mm at ground floor only to provide improved visibility onto the High Street. Amendments to Forge Cottage on Missenden Mews to relocate front door, relocate car parking space and provision of new private amenity space within the site.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2020 (LDO) - Compliance Checklist application for Zone C (Erection of industrial/R&D unit with offices and associated parking, landscaping, drainage, and service/utility infrastructure.) pursuant to the discharge of Conditions G1. (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10. (Signage and Wayfinding Strategy); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P4. (Pedestrian Footpaths); P6. (Surface Water Drainage); P7. (Foul Drainage); P8. (Noise); P9. (Building Use); P11. (Building Maintenance); P12 (Renewable Energy); and S3. (Landscape Maintenance).