Beckett House 60-68 St Thomas Street London Southwark SE1 3QU
Non material amendment for planning application 20/AP/0944 dated 17/11/2021 for redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development. Internal and external amendments comprising: changes to the escape stairs; changes to the lifting strategy; consequential changes to the roof profile, eastern facade, and north terrace; changes to plant and landscaping. Amendments resulting from design development and changes to fire safety regulations.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".