Former SCC HQ County Hall Penrhyn Road Kingston Upon Thames KT1 2EA
Listed Building Consent for the refurbishment, restoration and extension of the County Hall (Grade II*) to provide flexible commercial use (class E) and residential use (class C3), demolition of The Canteen Building and The Computer Wing Building, erection of replacement buildings of between 2 and 6 storeys for residential use (class C3), alterations to the existing boundary including Nos. 5 & 7 Milner Road, new means of access, associated public realm and landscaping, highway works, car and cycle parking and all ancillary and associated work (Amended Description, Amended Plans and Additional Information Received)
Former SCC HQ County Hall Penrhyn Road Kingston Upon Thames KT1 2EA
Refurbishment, restoration and extension of the County Hall (Grade II*) to provide flexible commercial use (class E) and residential use (class C3), demolition of The Canteen Building and The Computer Wing Building, erection of replacement buildings of between 2 and 6 storeys for residential use (class C3), alterations to the existing boundary including Nos. 5 & 7 Milner Road, new means of access, associated public realm and landscaping, highway works, car and cycle parking and all ancillary and associated work. This application is accompanied by an Environmental Statement. (Amended Description, Amended Plans and Additional Information Received)
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 19 (Co2 & Water) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Non Material Amendment to Planning Permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) to provide an automatic opening vent (AOV) into the eastern roof elevation of Block C.
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
The Fountain 120 Malden Road New Malden KT3 6DD
Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts
312, 318 - 320 Ewell Road Surbiton KT6 7AW
Details required by Condition 4 (Construction Method) , Condition 11 (Landscaping) and Condition 15 (Contaminated Land Assessment) of Planning Permission 19/02482/FUL (Change of use of motorcycle show sales units 318, 320 and 312(Class Sui Generis) to Retail (Class A1). Demolition of the existing ground and first floor rear extensions, ancillary buildings and the 1.5 storey workshop to the side and rear of unit 318 and 320 Ewell Road. Erection of a single, two and three storey extension to the eastern side and rear of the existing building unit 318 and 320 and further internal alterations. Erection of two semi-detached properties to the rear of the site to accommodate 2x retail and 9 residential units with provision of 6 parking spaces and 16 cycle stores.)