Bondway Commercial Centre 69 - 71 Bondway London
Approval of details pursuant to condition 11 (Lighting strategy) and part discharge condition 13(h) (Landscape/ Public Realm Plan - lighting strategy) of planning permission ref: 16/05309/VOC (Variation of condition 2 (Approved Plans) of planning permission 14/00601/FUL (Demolition of existing buildings and redevelopment of the site to provide a residential led mixed use development in a building part 24/part 50 storeys in height (+ 3 levels of basement) and comprising 728.5 sqm of ground floor commercial units (flexible use class A1, A2, A3 and A4) , 5,171 sqm of office floorspace (use class B1) and 450 residential units). Granted on 12.02.2015 Amendments sought include: Change of cooling/heating system and hot domestic water from a Chiller/Boiler & CHP System to a Variable Rate Flow (VRF) System; Screening room and children's play are relocated to accomodate new VRF plant area; Increase in height of roof plant on north tower from 350mm to 460mm; A reduction in number of basement levels; A reduction in car parking spaces from 107 to 48 Relocation of bike stores; Relocation of 6 intermediate housing units from the north tower to the south tower; Amendments to unit mix and layouts; Amendments to retail unit layouts; Amendments to private and communal amenity space and; Amendments to facade of building. Increase to Class B1 office floorspace of 44.72sqm) granted on 15.09.2017.
10 Pascal Street London SW8 4SH
Application for a deed of variation to S106 agreement pursuant to planning permission ref: 15/06216/FUL (A residential led mixed use development above and surrounding the proposed Nine Elms Station comprising four buildings between 5 and 20 storeys above the station podium and ranging in height from 29m AOD to 92m AOD, providing 332 residential units (C3) comprising 1 bed, 2 bed, 3 bed and 4 bed apartments; 4,811sqm of workspace/office (B1); 272sqm of assembly and leisure (D2) and 580sqm of retail (falling within class A1/A3/A4), a new public square, amenity space, play space, pedestrian and cycle connections, cycle parking, disabled car parking and associated works) granted on 16.05.2016. Amendment sought: Amendment sought to Schedule 3 (Contributions); Schedule 4 (initial Intermediate Rented Units); Schedule 6 (Affordable Housing Review); Schedule 9 (Employment and Skills Plan); Schedule 10 (Energy strategy) Schedule 13 (Landscaping) to facilitate the delivery of Block D separately from blocks A, B and C.