Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to "Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (41.8 metres), plus basement, comprising 5,576 sqm of Class E floorspace, including light industrial use at ground floor level, flexible office floorspace to the 9 upper floors, and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) and conversion of existing double height tv studio to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access.", at: Battersea Studios, 80 Silverthorne Road, SW8 3HE.
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (40.9 metres), plus basement, comprising 546 sqm light industrial use (Class E) at ground floor, 4,905 sqm flexible office floorspace to the 9 upper floors (Class E) and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access. At: Battersea Studios Silverthorne Road SW8 3HE
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (40.9 metres), plus basement, comprising 546 sqm light industrial use (Class E) at ground floor, 4,905 sqm flexible office floorspace to the 9 upper floors (Class E) and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access at : Battersea Studios Silverthorne Road SW8 3HE
Tyler House Sidney Road London SW9 0UA
Application for a Non-Material Amendment following a grant of planning permission 16/07104/FUL (Refurbishment of the existing building, involving new extensions, 2 lift shafts and erection of a roof extension with corner duplex to provide 13 additional residential units, together with provision of car parking, covered bike stores plus cycle stands, refuse/recycling storage, new play area and landscaping, along with other external alterations) granted on 27.11.2017. Amendment sought: Re-wording of condition 16B to read: Evidence (e.g. photographs, installation contracts and as-built certificates under the Standard Assessment Procedure) should be submitted to the Local Planning Authority within 28 days from completion of the development hereby permitted and approved in writing to show that the development has been constructed in accordance with approved Energy Strategy and achieved a 35% reduction in carbon dioxide emissions. Original condition reads: Prior to first occupation of the building(s) evidence (e.g. photographs, installation contracts and as-built certificates under the Standard Assessment Procedure) should be submitted to the Local Planning Authority and approved in writing to show that the development has been constructed in accordance with approved Energy Strategy and achieved a 35% reduction in carbon dioxide emissions.