55 Eversley Park Road London N21 1NR
Details pursuant to ref: 23/01590/FUL for demolition and construction management plan (6), refuse storage (8), energy statement (9), internal consumption of potable water (11), landscaping (12), Sustainable Drainage Strategy (13), cycle parking spaces (14), ecological enhancements (15) and boundary treatments (16) in respect of the redevelopment of site involving demolishment of existing bungalow and erection of 2-storey dwelling house with rear dormer and front and side rooflights and side roof solar panels.
63 And 65 And Rear Of 59-65 Bramley Road London N14 4HA
Details pursuant to Ref: 21/04804/FUL for hard and soft landscaping (4) sustainable drainage system (6) construction management plan (7) and green roof details (14) in respect of the redevelopment of site involving demolition of Nos.63 & 65 Bramley Road, construction of a new road and erection of 8Nos. single family dwellings with associated landscaping, amenity space, bin storage and cycle parking.
Car Park Chapel Street Enfield EN2 6QF
Details pursuant to Ref: 21/03122/FUL for archaeological heritage instruction (3),contaminated land (4) construction management plan (5), energy statement (11), suds (13) portable water (15) in respect of the erection of 5x 2-storey single family dwellings with rooms in roof together with associated parking, landscaping and amenity.
63 And 65 And Rear Of 59-65 Bramley Road London N14 4HA
Details pursuant to ref: 21/04804/FUL: external finishing materials (3), hard and soft landscaping (4), enclosure (5), SuDs (6), Construction Management Plan (7), Arboricultural Method Statement (8), cycle parking (9), refuse storage and recycling (10), potable water (11), green roof/wall (14), footway/vehicular Crossover (15), for the redevelopment of site involving demolition of Nos.63 & 65 Bramley Road, construction of a new road and erection of 8Nos. single family dwellings with associated landscaping, amenity space, bin storage and cycle parking.
King Easton Garden Centre, 69, Station Road, London, N21 3NB
Details submitted to ref TP/09/1051for conditions 2 renewable energy, 3 tree protection, 4 construction management plan, 9 cycle parking, 13 sustainable drainage, 14 surface water design and 20 landscaping in respect of erection of 7 residential units comprising two 2-storey detached dwellings (1 x 3-bed, 1 x 5-bed) with accommodation in roof and dormer windows, and a 2-storey block of 5 x 2-bed terraced houses with roof terraces and dormer windows, together with access from Compton Road and provision of 10 car parking spaces.
Land To The Rear Of 102-104 First Avenue Enfield EN1 1BP
Details pursuant to ref: 20/02039/FUL: Construction Management Plan (3), external finishing materials (4), external fenestrations (5), landscaping (6), biodiversity enhancements (7), Energy Statement (8), potable water (10), cycle parking (13), refuse storage facilities (14), M4(2) (15), ground levels (17), green roof (18), surfacing materials (20), for the sub-division of site and erection of a pair of semi-detached dwellings with associated cycle parking and landscaping.
29 The Chine London N21 2EA
Details submitted pursuant to reference 18/03550/FUL: external finishing materials (3), cycle storage (5), refuse and recycling storage (6), construction management plan (7), landscaping plan (9), tree protection and arboricultural method statement (10), energy statement (11), potable water (12) and SuDS (13) in respect of subdivision of site involving demolition of existing garage and erection of single storey Chalet style 2-bed family dwellinghouse with habitable space in the roof with associated dormers, accessed via Nestor Avenue.
44 The Orchard London N21 2DH
Details submitted pursuant to reference 21/00468/FUL: external finishes (3), surfacing materials (4), existing and proposed ground levels (5), tree protection plan and method statement (10), landscape proposals (11), bat surveys (14), bat and bird tile/boxes (15), refuse and recycling storage facilities (16), cycle parking (17), access (19), preliminary drainage strategy (20), potable water (22), energy statement (23), construction management plan (25) and site waste management plan (26) in respect of redevelopment of site by the erection of 2x detached 2-storey dwelling houses, with accommodation in the roof space including provision of car parking, refuse, cycle storage, electric car charging point and amenity space.
393 Cockfosters Road Barnet EN4 0JS
Details submitted pursuant to reference 20/02867/FUL: levels (4), construction management plan (8) and bat bricks/tiles (13a) in respect of demolition of existing buildings and erection of a 2-storey single family dwellinghouse with rear balcony and accommodation in roof space, detached garage to front, refurbished swimming pool house at rear, landscaping and boundary treatments.
Social Club 97 Ordnance Road Enfield EN3 6AG
Details pursuant to ref: 17/02541/FUL: external finishing materials (3), hard surfacing (4), landscaping (5), green roof (6), levels (9), access roads and junctions (11), SuDs (15), Construction Management Plan (18), Energy Statement (20), for the redevelopment of site involving demolition of building and erection of 3- storey building comprising social club on ground floor and 8 self contained flats on the upper floors (4x 1 bed and 4x 2bed) together with erection of 6 x 3 bed single family dwellings at rear involving basement level with lightwell and associated parking , amenity and landscaping.