196 High Street Barnet EN5 5SZ
Variation of condition 1 (Approved Plans) of planning permission reference 23/2311/FUL dated 11/09/2023 for 'Change of use of ground floor from restaurant to flexible use (Class E). Conversion of first floor into 2no self-contained flats. Self-containment of existing second floor flat including insertion of an AOV (Automatic Opening Vent) to rear roof slope. New shop front. Creation of front access to residential units. Provision of cycle and bin storage to rear. Associated internal and external alterations including changes to windows and insertion of 2no. conservation rooflights to first floor rear flat roof, lower the rear part of the first floor level, internal change in floors.' Variation/amendments to include extension to first floor rear/side and second floor to facilitate a larger unit to flat 2
64 Northfield Avenue West Ealing W13 9RR
Application for a Minor Material Amendment (S73a) to vary condition 2 (Approved Drawings) of planning permission ref: 194784FUL dated 29/05/2020 for: Part change of use from bakery (Use Class A1) to residential (Use Class C3); first floor rear/side infill extension; alteration of roof from hip to gable end; rear roof extension; roof extensions to rear outrigger roof slopes; conversion part of the property into 3 self-contained flats. Variation seeks to alter the internal layout and use of ground floor shop unit as office and staff accommodation
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.