The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 19 (Co2 & Water) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
51 Blakes Lane New Malden KT3 6NS
Details required for Conditions 3 (External Materials), 5 (Hard and Soft Landscaping), 6 (Renewable Energy), and 9 (Boundary Treatment) of planning permission 19/02817/FUL (Variation of Condition 2 (Approved Plans) of Planning Permission 18/14856/FUL (Demolition of existing house. Erection of a two storey residential development (with roof space accommodation) to provide 2 x 2 bed and 2 x 3 bedroom flats with associated parking, landscaping and amenity.) for erection of additional rear dormer to south elevation, additional obscured glazed window to side elevation and removal of 2 no. roof lights and installation of 1 no. roof light)
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendment to include removal of chimneys at plots 44, 88, 98, 130 and 134
The Fountain 120 Malden Road New Malden KT3 6DD
Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts
The Fountain 120 Malden Road New Malden KT3 6DD
Details required by Condition 10 (Levels of Buildings, Roads, Parking Areas and Pathways) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)