Land Bound By Somerleyton Road, Coldharbour Lane And Railway Line London SW9
Approval of details pursuant to the partial discharge of conditions 23 (green or brown roof), 28 (cycle parking) and 42 (Management and Maintenance Plans) for Blocks A and B (Phase 1) only of Planning permission ref: 19/00671/VOC "Variation of condition 2 (Approved Plans) of Planning Permission Ref: 15/05282/RG3 (Demolition of existing buildings on-site (with the exception of Carlton Mansions which is retained and refurbished) and redevelopment to provide a residential-led, mixed use development comprising 304 new dwellings (50% affordable) and approximately 8,000 sq.m (GIA) of non-residential uses including a theatre (Sui Generis) and employment, retail and community uses (Use class B1/D1/A1/A2) with associated parking, landscaping and ancillary works.)" granted on 27.01.2021
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).