381 Redmires Road Sheffield S10 4LE
Lawful Development Certificate for erection of proposed single-storey rear extension to dwellinghouse and rear dormer roof conversion (Application under Section 192)
47 Staindrop Crescent Darlington DL3 9AQ
Certificate of Lawfulness for proposed development - conversion of the attic into habitable space with the erection of a box dormer extension to the rear and installation of 2 no. roof lights to the front, together with new level access to the rear of dwelling
25 Ashby Road Kegworth Derby DE74 2DH
Certificate of lawful proposed development for a loft conversion, hip to gable roof extension to the rear elevation of the dwelling and insertion of no. 2 dormer windows (side elevations)
14 Norwood Road Sheffield S5 7BD
Application for a Lawful Development Certificate for alterations to roof of dwellinghouse including hip to gable roof conversion, erection of rear dormer extension and 2no. front rooflights (Application under Section 192)
Land At The Former Rolle College Fairfield Road Exmouth
Variation of condition 2 (approved plans) of planning permission 20/1838/MFUL (Demolition of existing buildings and the residential development of 33 new homes in a mix of 10 no. dwellings and 19 apartments and the conversion and refurbishment of Eldin House to create 4 apartments, partial demolition of potting shed and greenhouse and extensions to create dwelling, together with vehicle and pedestrian accesses, landscaping and associated infrastructure) to allow design changes to the approved apartment block which include changes to balconies, window position and alignments and the addition of a lift overrun to the roof and the approved dwellings which include internal layout changes, the addition of porches, changes to window positions and design.
12 Malcolm Road Shirley Solihull B90 2AH
Certificate of lawful development for proposed conversion to rear of garage area for a utility room and to upgrade external wc building that is to be internal to dwelling house. The garage roof (rear section only) to be converted to a flat roof that will require an increased height in the existing eave height (as shown on drawings). An existing conservatory to be converted to an extension to form internal habitable space to the house and upgrade existing above ground elements to meet regulation for the use of a habitable heated space.
149 Felstead Road Orpington BR6 9AH
Single storey side extension, loft conversion to create two storey dwelling including hip to gable and rear dormer with Juliet balcony and front roof lights LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
125 Harrow Road West Bridgford Nottinghamshire NG2 7DY
Application for a Certificate of Proposed Lawful Development for a loft conversion comprising a hip-to-gable rear extension and a side dormer extension to the roof of the dwelling.
24 Lynton Avenue Orpington BR5 2EH
The proposal is for a Loft conversion including a rear dormer extension and two front roof-lights to increase the habitable space of a domestic dwelling LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).