150 - 154 Borough High Street London Southwark SE1
Details of Condition 8 'Archaeological Public Engagement' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
150 - 154 Borough High Street London Southwark SE1
Details of Condition 9 'Post Excavation Assessment Report' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
Unit 1 Maple House Winterstoke Road Weston-super-Mare North Somerset
Erection of a single storey front extension to existing shop unit. Erection of single storey infill extension to rear of building and construction of an external staircase to rear of property. Internal alterations to ground floor commercial units and alterations to windows to rear elevation and installation of new windows/doors. Change of use of first floor offices to 1no. two bedroom self-contained flat with alterations to side window to create new entrance and creation of a patio area with railings.
150 - 154 Borough High Street London Southwark
Details of Condition 18 'Construction Details' pursuant to planning permission ref. 21/AP/0960: 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.'
Land At 6 - 8 Salisbury Road Bromley
Demolition of existing garages and single storey buildings at Nos. 4 and 6-8 Salisbury Road. Construction of part 2-storey extension to existing shop including new roof to existing shop/office building at No 4. together with 2 No. new 2 storey 2-bed houses, associated access & parking for cars & cycles, landscaping, boundary treatment and storage sheds to include refuse & recycling provision for residential and commercial uses. (Renewal of existing permission - 17/03649/FULL1).
150-154 Borough High Street London SE1 1LB
Details of Condition 10 'Detailed Drawings' pursuant to planning permission ref. 21/AP/0960: 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.'
150 - 154 Borough High Street London Southwark
Details of Condition 11 (Green Roofs For Biodiversity) as required by planning permission dated 21/03/2022 [LBS Ref: 21/AP/0960] for 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant'.
76 Upper Ground London SE1 9PZ
Application for variation of condition 2 (Approved Plans) of Listed Building Consent ref: 22/02501/LB for amendments to approved application ref. 21/01143/LB, and in association with an application for a non-material amendment (22/02518/NMC) following a grant of planning permission ref: 21/01142/FUL (Refurbishment, partial demolition and extension of the existing building to provide additional office space (Use Class E(i)) and retail (Use Class E (a) or (b)) at ground floor level alongside associated cycle parking and public realm enhancements.), granted on 23.12.2021. Amendments proposed: External metal finish: Change from anodised aluminium to powder coated aluminium; Terrace upstand: Replacing concrete upstand to glazing on terrace levels with powder coated aluminium; Handrails: Raise terrace metal handrails by 50mm to allow for construction tolerance and safe guarding; Eastern pedestrian route landscaping: Additional staircase from Queen's Walk; Main entrance door: Reduction in height and configuration; Terrace Doors: Replacing sliding terrace doors with swing doors; and Reinstatement of existing staircases: Existing external staircase from Queen's Walk to retail unit to be retained.
76 Upper Ground London SE1 9PZ
Approval of details pursuant to condition 7 (Arboricultural Method Statement - construction and landscaping) of planning permission 20/02784/FUL (Refurbishment, partial demolition and extension of the existing building to provide additional office space (Use Class E(i)) and retail (Use Class E (a) or (b)) at ground floor level alongside associated cycle parking and public realm enhancements) granted 23.12.2021.
76 Upper Ground London SE1 9PZ
Partial approval of details pursuant to condition 4 (Construction and Environmental Management Plan) of planning permission 21/01142/FUL (Refurbishment, partial demolition and extension of the existing building to provide additional office space (Use Class E(i)) and retail (Use Class E (a) or (b)) at ground floor level alongside associated cycle parking and public realm enhancements) granted on 23.12.2021.