Part Of The South Acton Estate Acton London W3 8RF
Submission of a Drainage Strategy plan in part pursuant to condition 16 (Phase 6 - as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).
Part Of The South Acton Estate Acton London W3 8RF
Submission of a Remedial Scheme & Verification in part pursuant to condition 15 (as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Wood Dene Site Bounded By Queens Road Meeting House Lane And Carlton Grove SE15
Details of Condition 19 part b 'Code for Sustainable Homes Final (Post Construction Certificates)' pursuant to planning permission ref. 14/AP/3029 (Variation of Condition 2 (approved plans) of planning permission 13/AP/0876 for: "Demolition of remaining structures and erection of three buildings between two and nine storeys in height to provide 333 residential units and 450sqm (GIA) of flexible retail (Classes A1-A3) / Office (Class B1) / Non-Residential Institution (Class D1) space together with the provision of access, car and cycle parking, plant, landscaping and an energy centre" to allow for amendments to the design of the facade and chimney of the energy centre in block C).
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.
3-5 Easthampstead Road Wokingham RG40 2EH
Application to vary conditions 2, 3, 4, 5 and 6 of planning consent 202104 for the proposed change of use from offices to residential to create 4 no. flats � 1 no. one bedroom and 3 no. two bedroom - plus the erection of a single storey front extension to form a bin store, part conversion of existing garage to habitable accommodation and cycle storage, erection of privacy screen in rear courtyard and changes to fenestration. Condition 2 relates to the approved documents; condition 3 to conservation details; condition 4 to a construction method statement; condition 5 to landscaping details, and condition 6 to a ventilation strategy. The variation is to allow replacement of existing windows, removal of a partially glazed partition and addition of low-level lighting, plus submission of details relating to conservation, construction, landscaping and ventilation.
Acton Gardens Central Plaza Phase 6 Acton W3 8DA
Application for a Non-Material Amendment in (S96a) seeking to amend the timing trigger of Condition 36, in relation to planning permission reference 160794VAR dated 09.12.2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'
Phase 6 Of The South Acton Estate Bollo Bridge Road Acton W3 8RF
Details of landscaping part pursuant to Condition 5 (parts b, c and d) (Phase 6) of planning permission ref: 160794VAR dated 09.12.2016 as varied by 161240NMA dated 10.08.2016 for: 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Details of External Lighting pursuant to condition 10 (Phase 6.2) of planning permission ref: 160794VAR dated 09.12.2016 for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)"
Former Quarry House 81 Quarry Hill Road Borough Green Sevenoaks Kent TN15 8RW
Details of conditions 5 (flood risk measures), 6 (contamination, remediation and verification), 8 (site investigation and remediation), pursuant to planning permission TM/20/02187/FL (Variation of condition 8 (contamination), 9 (verification report), 12 (site investigation) and 13 (verification report) submitted pursuant to planning permission TM/20/00837/FL (Variation of condition 7 (construction phasing arrangements) of TM/19/02047/FL (Demolition of the existing office building and the erection of 9no residential dwellings, access from existing Quarry Hill roundabout, provision of public open space, works associated with de-culverting and diversion of the watercourse, sustainable urban drainage systems, associated landscaping, infrastructure and earthworks))