922 - 930 Purley Way Purley CR8 2JL
Discharge of condition 4 (Construction Logistics Plan) attached to planning permission 22/01141/CONR for Variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
922 - 930 Purley Way Purley CR8 2JL
Discharge of condition 4 (Construction Logistics Plan) attached to planning permission 22/01141/CONR for variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).