Sonning House and Weavers Cottage Pearson Road Sonning Wokingham RG4 6UL
Householder application for the proposed erection of a single storey rear extension and a first floor rear extension, addition of 3 no. dormer windows, a balcony and external staircase, a pitched roof over the existing garage, changes to fenestration and modifications to roof plus new front railings and gate and associated landscaping to facilitate conversion of Sonning House and Weavers Cottage into one single dwelling, following removal of the existing single storey side lobby, rear bay window and front boundary wall; installation of a swimming pool and erection of an associated pool house.
Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
7 Briar Close & 8 Blackwell Grove DARLINGTON
Approval of details reserved by condition 3 (CMP) attached to planning permission 22/01252/FUL dated 02 Feb 2023 (Conversion of existing bungalow (8 Blackwell Grove) and amalgamation of plots to create pool house and gymnasium for use by 7 Briar Close with the erection of a linked extension with pergola and patio area, replacement raised roof with 4 no. dormer windows, new pitched roof to garage and incorporating conversion of integral garage within main dwelling into habitable space. Single storey extension to the rear of No 7 Briar Close. Landscaping works including removing access from Briar Close with the repositioning of electronic access gates with stone piers (off Blackwell Grove) and infill gap to form brick boundary wall, hard standing, gazebo, 1.2m high fencing and associated landscaping works) (Amended Construction Management Plan received 20 March 2023)
7 Briar Close & 8 Blackwell Grove DARLINGTON
Conversion of existing bungalow (8 Blackwell Grove) and amalgamation of plots to create pool house and gymnasium for use by 7 Briar Close with the erection of a linked extension with pergola and patio area, replacement raised roof with 4 no. dormer windows, new pitched roof to garage and incorporating conversion of integral garage within main dwelling into habitable space. Single storey extension to the rear of No 7 Briar Close. Landscaping works including removing access from Briar Close with the repositioning of electronic access gates with stone piers (off Blackwell Grove) and infill gap to form brick boundary wall, hard standing, gazebo, 1.2m high fencing and associated landscaping works (amended plans and entrance gate details received 6 January 2023)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights