38 Newlands Avenue Radlett Hertfordshire WD7 8EL
Demolition of existing garage, partial demolition of the house, construction of a two storey side extension, two storey front extension and single storey rear extension to include relocated front entrance with canopy and associated alterations to fenestration. Conversion of loft to habitable space to include an increase in ridge height, 4 x rear dormer windows, insertion of a roof light to both side elevations and chimney stack removal. Associated landscaping to include patio area to rear garden and front boundary works to include re-paved driveway and new front boundary wall with brick piers and metal railings (resubmission of 23/0823/HSE).
98 Gordon Road West Ealing London W13 8PJ
Submission of a Demolition Method Statement and Construction Management Plan pursuant to Condition 10 of Planning Permission ref: 213544FUL dated 25/05/2022 for: Conversion of existing house into 8no. self-contained flats; part single, part two storey rear and side (wraparound) extension (following demolition of existing additions); conversion of roof space into habitable space including installation of rooflights and dormer windows; provision of amenity space, cycle storage, refuse storage and 2no. car parking spaces; and alterations to boundary treatment including installation of 2no. pedestrian gates
18 Hendon Avenue London N3 1UE
Variation of condition 1 (Approved Plans) of planning permission 19/6319/FUL, dated 26/02/2021 for `Conversion of existing 3no. flats into 1no. single family dwelling house including partial demolition of the existing building and demolition of two existing garages, construction of a new basement level with plant areas, part single, part two storey side and rear extensions with associated alterations and extension to roof with 2no. rear dormer windows, replacement of windows including new bay windows to front elevation. New boundary fence and walls with additional vehicular access`. Variation to include additional demolition to the front section of the existing roof and rebuilding of the chimney stacks.