Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London
Partial discharge of condition 21 (east site - sample panels for towers E2 and E3 only) pursuant to to planning permission 21/AP/1104 which is a minor material amendment to planning permission 20/AP/3675 for 'Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys (with a maximum building height of 124.5m AOD) above multi-level and single basements, to provide a range of uses including 979 residential units (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station; means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures'.
The Straight Southall Middlesex UB1 1QX
Details of validation/verification report in relation to Area 3 DNAPL remediation for partial discharge of Condition 38 of planning permission ref: 171562VAR dated 16/10/2017 for: Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.
Southall Gas Works Site The Straight Southall Middlesex UB1 1QX
Details of a Verification Report (soft landscaping) part pursuant to Condition 38 (part discharge in relation to Building G of Phase 1) of planning permission ref: 171562VAR dated 16/10/2017 for: Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road.
133 Park Street And 105 Sumner Street London SE1 9EA And SE1 9HZ Southwark
Full discharge of Condition 22 'External Lighting Scheme' as required by planning permission 19/AP/5664 [Approval date: 18.08.2020], which itself is the most recent variation of original planning permission 16/AP/4569 [Approval date: 20.10.2017], for: "Minor material amendment to planning permission 16/AP/4569 for the demolition of existing buildings and redevelopment to provide two Class B1 office buildings of nine storeys and ten storeys plus plant. The development will include the creation of a new basement; new public realm; provision of a retail (Class A1/A3/A5) kiosk; hard and soft landscaping and other associated works. The proposed amendments include: - Reduction in the size of the basement; - Consolidation of basement to Block A; - Relocation of plant; - Provision of a cycle ramp; - Minor amendments to the massing of Block A and B; - Minor re-positioning of Block B; - Facade and design amendments to both Block A and B; - Increase of above ground floorspace of 1,130sqm (GIA)"
133 Park Street And 105 Sumner Street London SE1 9EA And SE1 9HZ
Partial discharge of Condition 18 (part a only) 'BREEAM Report' attached to planning permission 19/AP/5664 [Approval date: 14.08.2020] for: "Minor material amendment to planning permission 16/AP/4569 for the demolition of existing buildings and redevelopment to provide two Class B1 office buildings of nine storeys and ten storeys plus plant. The development will include the creation of a new basement; new public realm; provision of a retail (Class A1/A3/A5) kiosk; hard and soft landscaping and other associated works."
56 Sampson House, 64 Hopton Street And Ludgate House, 245 Blackfriars Road And Railway Arches London Southwark SE1 9JH
Details of Condition 19 'Sample Materials' relating to Ludgate Building C only (Partial discharge) of planning permission LBS reg no 18/AP/1702 for a Minor material amendment to regularise the condition numbers pursuant to planning permission 17/AP/2286 for: (Variation of Condition 2, approved plans, of planning permission 12/AP/3940 for "Demolition of existing buildings and the construction of a mixed use development totalling 144,622 sq.metres GEA comprising 489 flats (Class C3), 45,378 sqm (including basement) of offices (Class B1), 2,627sqm of retail (Classes A1-A5), 1,969sqm of community uses (Class D1) and 1,014sqm of gym (Class D2). New open space including formation of two new east-west routes, new public square, reconfigured vehicular and pedestrian access and works to the public highway with associated works including landscaping and basement car park for 200 cars (including 54 disabled car parking spaces) plus servicing and plant areas. Change of use of the railway arches from a nightclub to retail, gym and community uses. Configuration of the toilet block for retail uses and toilets. The development contains of 9 new buildings: Ludgate A: 13 storeys (62.08m AOD), Ludgate B: 49 storeys (169.60m AOD), Ludgate C: 15 storeys (73m AOD), Sampson A: 17 storeys (62.85m AOD), Sampson B: 31 storeys, (112.10m AOD), Sampson C: 27 storeys (98.30m AOD), Sampson D: 14 storeys (60.80m AOD), Sampson E: 5 storeys (24.6m AOD), Sampson F: 6 storeys (28.9m AOD)",to allow for amendments to two consented office buildings. An additional 3 storeys to Ludgate C with design changes and a reduction of 7 storeys to Sampson D with design changes.)