Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
43 Gunnersbury Avenue Ealing London W5 4LP
Application for a Minor Material Amendment (S.73) variation of condition 2 approved plans, to allow the reconfiguration of Units 1 and 3 to create duplex units, the creation of external access for Unit 2 and the relocation of 20no. cycle parking spaces, in pursuant to planning permission 182600FUL dated 14/12/2018 for 'construction of a two storey building (with basement level and roof level accommodation) to provide 10 self contained flats (following demolition of existing detached dwelling house) with associated amenity space, car parking, refuse and cycle storage.'
43 Gunnersbury Avenue Ealing London W5 4LP
Application for a Minor Material Amendment (s73) in relation to planning permission ref: 182600FUL dated 14/12/2018 for 'construction of a two storey building (with basement level and roof level accommodation) to provide 10 self contained flats (following demolition of existing detached dwelling house) with associated amenity space, car parking, refuse and cycle storage.' Application seeking additional 3.0m deep rear extensions at ground floor and basement levels and installation of 4 no. mansard-style dormers to each side roofslope (north and south)