The Straight Southall UB1 1QX
Details of a remediation validation/verification report in part pursuant to condition 38 (Phase 3 only) of planning permission ref: 171562VAR dated 16.10.2017 for "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the
The Straight Southall Middlesex UB1 1QX
Details of external noise in part pursuant to condition 79 (Phase 3 only) of planning application Ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle..........'
Shell Centre 2 - 4 York Road London SE1 7ND
Application for a non-material amendment following a grant of planning permission ref: 12/04708/FUL (Part demolition of Shell Centre comprising Hungerford, York and Chicheley wings, upper level walkway, removal of raised podium deck, associated structures and associated site clearance to enable a mixed use development of 8 buildings ranging from 5 to 37 storeys in height and 4 basement levels to provide up to 218,147m2 of floorspace (GIA), comprising offices (B1), residential (C3) (up to 877 units), retail (A1-A5), leisure (D2) and community/leisure uses (D1/D2), parking and servicing space, hard and soft landscaping together with the provision of a new public square, highway and landscaping works to Belvedere Road, Chicheley Street and York Road, modifications to York Road Underground station, 2 link bridges from new buildings to the existing Shell Centre Tower, reconfiguration of York Road footbridge if retained, creation of new vehicular access and other associated works) granted on 06.06.2014. Amendment sought: The proposed non-material amendments relate to Levels 12 and 13 of Building 5 and comprise: -changes to the accommodation provision to increase the north most penthouse from 3 bedrooms to 4 bedrooms; -an amendment to the northwest corner facade line to bring forward the line of the curtain walling on the northwest penthouse; -the addition of a new openable vent on the west facade; and -the redistribution of several back painted glass panels on the east facade.
The Straight Southall Middlesex UB1 1QX
Details of home zone within each residential part plan in part pursuant to condition 72 (Phase 3) of planning permission Ref:171562VAR dated 16.10.2017 "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial
Hammersmith Town Hall King Street London W6 9JU
Non-material amendment to approved Application (Ref: 2018/01500/FUL granted 22 October 2019) relating to the Demolition of 181-187 King Street, Town Hall Extension, Quaker Meeting House 20 Nigel Playfair Avenue (West), Register Office Nigel Playfair Avenue (West) and remainder of former Cineworld 207 King Street. Redevelopment, to include the Nigel Playfair Avenue (West) Car Park and Nigel Playfair Avenue (East), to provide four new build blocks comprising existing and new basements plus between six and eight storeys in height comprising 204 dwelling units (Class C3), retail (Class A1), Restaurant/café use (Class A3), Cinema (Class D2) and Office (Class B1) to include enterprise units; internal and external alterations and roof extension of the Grade II Listed Town Hall building to provide refurbished civic centre and new office use (Class B1); creation of a civic square and public realm works, play space, landscaping and associated residential and non-residential car parking (including disabled), cycle parking, motorcycle parking, access and servicing (EIA Development). Internal and external amendments to new build elements (Block A, C and D) including changes to terracotta panel sizes, winter gardens, windows, and cores.
Hammersmith Town Hall King Street London W6 9JU
Non-material amendment to approved Application (Ref: 2018/01500/FUL granted 22 October 2019) relating to the Demolition of 181-187 King Street, Town Hall Extension, Quaker Meeting House 20 Nigel Playfair Avenue (West), Register Office Nigel Playfair Avenue (West) and remainder of former Cineworld 207 King Street. Redevelopment, to include the Nigel Playfair Avenue (West) Car Park and Nigel Playfair Avenue (East), to provide four new build blocks comprising existing and new basements plus between six and eight storeys in height comprising 204 dwelling units (Class C3), retail (Class A1), Restaurant/café use (Class A3), Cinema (Class D2) and Office (Class B1) to include enterprise units; internal and external alterations and roof extension of the Grade II Listed Town Hall building to provide refurbished civic centre and new office use (Class B1); creation of a civic square and public realm works, play space, landscaping and associated residential and non-residential car parking (including disabled), cycle parking, motorcycle parking, access and servicing (EIA Development). Amendments to Town Hall Square hard and soft landscaping, security and Hostile Vehicle Mitigation (HVM) proposals including the addition of new line of bollards for security strategy along King Street, Nigel Playfair East, Nigel Playfair West and within the site adjacent to the Town Hall. Amendments include an increase in hard and soft landscaping areas to integrate HVM elements.
Flat A First Floor 2 The Straight Southall Ealing UB1 1QX
Submission of a construction management phase plan in pursuant to condition 13 (Phase 2 only) of planning permission ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the ...'
Part Of The South Acton Estate Acton London W3 8RF
Submission of a Drainage Strategy plan in part pursuant to condition 16 (Phase 6 - as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).
Part Of The South Acton Estate Acton London W3 8RF
Submission of a Remedial Scheme & Verification in part pursuant to condition 15 (as it relates to Central Plaza) of planning application Ref: 160794VAR dated 09/12/2016 for: Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).
The Straight Southall Middlesex UB1 1QX
Details of foundation design in part pursuant to condition 39 (phase 2 only) of planning application Ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space., Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. , The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical ...etc''