Former Lawrence Automotive Site Sayer Drive Coventry CV5 9PF
Submission of details to discharge condition No. 14 (Noise and Vibration Management Plans); imposed on planning permission reference S73/2022/0165 granted on 06/05/2022 for Variation of Condition 2 (drawing Numbers) on planning permission FUL/2020/2794 for Construction of an industrial unit (General Industrial (Class B2) and/or Storage and Distribution (Class B8) use) with ancillary offices, access, servicing, parking, drainage and landscaping. Construction of HGV trailer parking for adjacent unit (Class B8) with pre-check offices, lighting, drainage and landscaping; and all other ancillary works approved on 12/11/2021 - to amend height of building, addition of a door to gatehouse, and relocation of HGV turning circle, erection of single storey plant room with plant on the roof, installation of first floor mezzanine, HVAC installation, additional windows, installation of silos, water treatment plant, smoking shelter, new automatic barrier and other external alterations.
Former Lawrence Automotive Site Sayer Drive Coventry CV5 9PF
Variation of Condition 2 (drawing Numbers) on planning permission FUL/2020/2794 for Construction of an industrial unit (General Industrial (Class B2) and/or Storage and Distribution (Class B8) use) with ancillary offices, access, servicing, parking, drainage and landscaping. Construction of HGV trailer parking for adjacent unit (Class B8) with pre-check offices, lighting, drainage and landscaping; and all other ancillary works approved on 12/11/2021 - to amend height of building, addition of a door to gatehouse, and relocation of HGV turning circle, erection of single storey plant room with plant on the roof, installation of first floor mezzanine, HVAC installation, additional windows, installation of silos, water treatment plant, smoking shelter, new automatic barrier and other external alterations.
Land At Energy Park Way Grimsby North East Lincolnshire
Variation of Condition 22 (approved plans) attached to planning permission DM/0329/18/FUL (Erection of industrial building and adjoined two storey office/control room to create power plant (18MW Energy From Waste) including construction of associated access, hardsurfacing, erection of 65m chimney stack and installation of necessary plant and machinery) - for alterations to main building including increase width of gasification train hall, increase width and height of mechanical polishing plant hall, ash silos to be moved 5m to west of turbine hall, dry air coolers to be moved behind turbine hall, length of air cooled condensers increased by 5m, erection of new gas kiosk, increase throughput of refused derived fuel (RDF) to 226,000 tonnes per annum and associated works