Peels Grays Lane Ibstone Buckinghamshire HP14 3XX
Householder application for construction of front porch, single storey side and rear extensions with balconied terrace over, partial garage conversion to habitable accommodation, construction of pitched roof to existing single storey link between main dwelling and annex, replacement construction of 3 x dormer windows to rear and associated internal and external works including widening and installation of new entrance gates with gate posts, creation of new driveway, fenestration alterations, installation of air source heat pump, construction of new retaining wall and steps and creation of 3 x parking spaces. Construction of new roof and windows to existing pool house. Refurbishment works to existing tennis court
5 Millway Ampleforth North Yorkshire YO62 4DR
Alterations to dwelling to include the construction of dormer windows and re-roofing work to allow loft conversion and rendering to all elevations. (Revised scheme to planning approval 21/01152/HOUSE dated 11.10.2021).
Lakeside House Ponteland Newcastle Upon Tyne Northumberland NE20 9HP
Alterations to dwelling house to include: 1. Removal of existing bay windows to South elevation and construction of two-storey entrance lobby. 2. Creation of double-height entrance hall and associated internal alterations. 3. Amendments to window positions, replacement of rotten window frames with high-performance powder-coated metal-framed windows. 4. Repositioning of existing and introduction of new projecting eaves-style dormer windows with stone mullions and traditional rolled lead roofs. 5. Conversion of existing garage to create much-needed utility, laundry and boot rooms including in-filling of void to swimming pool below. 6. Construction of single-storey kitchen extension of circa 23sqm. 7. Alterations to existing stairwell, removal of catslide roof and construction of flat roof with roof light with stone parapet to perimeter to improve head-height and natural light in stairwell. 8. Introduction of through-colour render to courtyard internal elevations. 9. Construction of new garage block, formation of parking courtyard to obscure cars and construction of stone connection building. 10. Demolition of existing timber outbuildings to facilitate construction of new equipment/tractor sheds due North of existing. 11. Alterations to driveway where it reaches house to create improved arrival sequence and guest parking.