Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendment to include removal of chimneys at plots 44, 88, 98, 130 and 134
2 West Green Barrington CB22 7SA
S73 variation of conditions 2 (Approved plans) and 6 (Flat roof covering) of ref: S/0102/20/FL (Demolition of existing outbuilding erection of a single storey side extension alterations to the existing dwellinghouse and associated infrastructure) to amend the roof form in order to create a more subtle and sympathetic roof form and condition 6 to be varied to allow the full discharge of the condition.
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.