6 Gunnersbury Avenue Ealing W5 3NH
Application for a Minor Material Amendment (S73a) to vary condition 2 (approved drawings) and condition 5 (refuse and recycling storage) of planning permission ref: 177450FUL dated 16/10/2019 for: Conversion of dwellinghouse into nine self-contained residential units (5x one bed and 4x two bed); single storey side extension, part single, part three storey rear extensions, rear dormer roof extension, installation of rooflights to side and rear roofslopes; associated alterations to the fenestration on all elevations; front boundary treatment and provision of car parking spaces, cycle, refuse/recycling storage and amenity space. Amendment seeks alterations to approved driveway arrangement to provide more parking space; and changes to front landscaping, and location of refuse storage
The Chapel, The Administration Building And The Water Tower (Legacy Buildings), Former Cane Hill Development Site, Off Brighton Road,, Coulsdon, CR5 3YL
Non-material amendment (alterations to the fenestration) to reserved matters application ref. 17/06316/RSM (The proposal is for the following components of the former Cane Hill Hospital: 1) Refurbishment, rebuild and extension the administration building to create 14 apartments 2) Refurbishment of the chapel to provide a range of potential uses falling within Classes A1-A5, B1 and D1-D2 3) Conversion and extension to the water tower to create a single residential dwelling 4) Associated landscaping, access and parking (Legacy Buildings Phase) (approval of reserved matters in respect of hybrid planning permission 13/02527/P for Redevelopment of the former Cane Hill Hospital Site to accommodate up to 677 residential units (net increase of 675 units). Class A1-A5, B1, C1, D1-D2 Uses. Car and cycle parking provision, landscaping and public realm works, interim works, and highway works including a new access onto Marlpit Lane/Brighton Road Roundabout and Portnalls Road comprising: Outline planning application for the retention and re-use of the Water Tower and Chapel and Refurbishment and Re-use of Administration Building for Class A1-A5, B1, C3, D1-D2 purposes. Re-Use/Rebuild of North Lodge as Use Class C3 single dwellinghouse. Relocation of Farm and Change of use of Glencairn from Use Class C2 to a Use Class C3 dwellinghouse, refurbishment and change of use of MSU building for farming purposes, and erection of three barns on tennis court site, a single building of 3,000m2 GEA for Office (B1) or Hotel (C1) uses. Up to 473 new residential units (Class C3) and new access onto Portnalls Road and re-use of existing access onto Portnalls Road. Full planning application for 187 residential units (Class C3) and engineering operations comprising a new road and access from the Marlpit Lane/Brighton Road (A237) Roundabout and associated infrastructure including drainage).
91 - 93 Peckham High Street London Southwark SE15 5RS
Minor material amendment to planning permission 16/AP/3075 [Approval date: 29.03.2019] 'Redevelopment comprising the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage' consisting of: - Changes to the design of Site/Block 1, including: - Reduction in the floor area of the consented gallery and associated facilities; - Reconfiguration of the residential core at ground floor level to incorporate a refuse store off Peckham High Street; - Addition of rooftop plant; - Alterations to the south, west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Transfer of sedum roof from roof of Level 02 to roof of Level 03; - Changes to the design of Site/Block 2, including: - Reduction in floor area of the co-working space; - Enlargement of building footprint; - Increase to the building's height; - Creation of separate bin store for co-working space; - Addition of rooftop plant; - Alterations to the west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Changes to landscaping and refuse strategy.