Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendment to include removal of chimneys at plots 44, 88, 98, 130 and 134