Longmeadow 41 Carrwood Hale Barns WA15 0EN
Application for variation of condition 2 (Approved Plans) on planning permission 94971/VAR/21 (Application for variation of condition 2 on planning permission 93564/HHA/18 (Erection of part single/part two storey rear extensions and garage link. Other external alterations to include dormer roof extension to existing garage; changes to elevational treatment; new wider vehicular entrance and gates, and changes to gates and gate piers.). To amend the approved plans to allow for the rear wall to be moved out by 1.5 metres at ground level beneath first floor balcony.). To convert the loft into habitable living accommodation with front velux windows, addition of an infill extension to the ground floor side and the installation of a bathroom to the first floor garage.
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.
Sandy Lane Business Park Unit 3 & 4 Sandy Lane Coventry CV1 4DQ Coventry
Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.)