Phase 6 Of The South Acton Estate Bollo Bridge Road Acton W3 8RF
Details of landscaping part pursuant to Condition 5 (parts b, c and d) (Phase 6) of planning permission ref: 160794VAR dated 09.12.2016 as varied by 161240NMA dated 10.08.2016 for: 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Details of External Lighting pursuant to condition 10 (Phase 6.2) of planning permission ref: 160794VAR dated 09.12.2016 for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)"
Land At Energy Park Way Grimsby North East Lincolnshire
Variation of Condition 22 (approved plans) attached to planning permission DM/0329/18/FUL (Erection of industrial building and adjoined two storey office/control room to create power plant (18MW Energy From Waste) including construction of associated access, hardsurfacing, erection of 65m chimney stack and installation of necessary plant and machinery) - for alterations to main building including increase width of gasification train hall, increase width and height of mechanical polishing plant hall, ash silos to be moved 5m to west of turbine hall, dry air coolers to be moved behind turbine hall, length of air cooled condensers increased by 5m, erection of new gas kiosk, increase throughput of refused derived fuel (RDF) to 226,000 tonnes per annum and associated works
Gasholder Station Kennington Oval London SE11 5SG
Approval of details pursuant to conditions 3 (Phasing Plan) and 15 (Construction Logistics Plan) of Planning Permission Ref: 20/00987/VOC (Variation of Conditions 2 (Approved drawings), 26 (Method Statement), 27 (Footings), 28 (Iron Work), 29 (Colour Scheme), 30 (c) (Archaeological) and 31(c) (Building recording) of Planning Permission ref : 17/05772/EIAFUL as amended by S96A ref: 20/00646/NMC (Demolition of existing buildings and structures including temporary disassembly of listed gas holder no.1, demolition of locally-listed gas holders 4 and 5, redevelopment to provide a mixed-use development comprising re-erection of restored gas-holder no.1, erection of new buildings ranging from 4-18 storeys to provide residential (Class C3), office (Class B1) incorporating ancillary cafe and space for community use, waste management use and community space (Class D1)) granted on 23/08/2018. The development originally consented under ref: 17/05772/EIAFUL is a departure from Policy ED1 of the Lambeth Local Plan (2015). Variations sought: Facade alterations, additional storey and unit reconfiguration to Block D and relocation of refuse and cycle storage areas for Block C. Variation of conditions 26, 27, 28, 29 to allow for below ground work. Variation of conditions 30(c) and 31 (c) to allow for retention in situ of Gasholder 1. Variation of Condition 75 to allow for additional quantum of development.) Granted on 17.07.2020
Rutland Mills Tootal Street Wakefield WF1 5JN
Variation of condition 2 (approved plans) of approved application 17/02995/FUL dated 11 October 2019 [which granted full planning permission for the demolition of existing buildings and structures forming part of the listed mill complex; the repair, adaptation and alteration of existing buildings forming part of the listed mill complex and Caddies Wainwright building; erection of new external stair and lift cores; repairs and alterations to chimney to create new sculptural form; and construction of a new building. Use of the mill complex and new building for a flexible mix of the following uses: Retail shops (A1); Market stalls (A1); Restaurants and cafes (A3); Bars (A4); Food and drink market stalls (A5); Offices (B1); Craft workshops (B1); Studios (B1); Microbrewery (B2); Hotel (C1); Art gallery / display spaces (D1); Conference space (D1); Education and training (D1); Events space (D2) and health and fitness (D2). Associated external circulation and seating areas; creation of new public realm and landscaping; riverside pier structure; flood defences; cycle parking; access arrangements and highways works; rooftop plant; and other associated works including temporary uses during construction] to permit: changes to the replacement of windows across the complex; changes to rooflight design (buildings 7, 9, 10 and 11); omission of the new-build vertical circulation to building 7; change to the vertical circulation (internal) to building 9; change to the entrance space to building 11; elevational changes across the complex; and changes to the approved landscape and public realm
Part Of The South Acton Estate Phase 9.1 Bollo Lane Acton London W3 8QZ
Details of Piling part-pursuant to condition 14 of planning application Ref: 160794VAR dated 09.12.2016 for'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)