Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Ummed Villa Birch Lane Purley CR8 3LH
Discharge of condition 7 (construction logistics Plan) attached to planning permission 22/02577/FUL for Demolition of existing house, alterations, erection of replacement single/two storey house incorporating dormer extensions with accommodation within the roof space, double garage and swimming pool
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Kings House, George Street West And 13-15 King Street Luton LU1 2BJ
Erection of three storey front extension, part three/six storey rear extension and an additional storey to provide 9 flats ( 3 x 3 bedroom, 4 x 2 bedroom and 2 x 1 bedroom), additional office and commercial accommodation and external alterations to the appearance of the building. Discharge of condition 3 (Construction Environmental Method Plan(CEMP)), 5 (samples of materials), 8 (Phase 1 site investigation report), 10 (noise impact assessment) and 19 (surface water drainage) of planning permission 21/00696/FUL dated 11th January 2022.
58 Highfield Road Purley CR8 2JG
Discharge of condition numbers 3 (Tree Protection Plan) and 4 (Landscaping) attached to planning permission ref. 21/04231/FUL (Alterations, including erection of part single storey part two storey side and rear extensions, roof alterations including recessed balcony in the rear roof slope and roof lights in the rear and side roof slopes, construction of vehicular crossover and alteration of single dwelling into two separate units.).
58 Reddown Road Coulsdon CR5 1AX
Discharge of condition 4 (construction logistics plan) attached to planning permission ref.20/02726/FUL (Demolition of single storey detached side garage and erection of a two/storey (with lower ground floor level and roof accommodation) building comprising 3 self-contained flats; new vehicular crossovers to facilitate vehicular parking for the host and new property; hard and soft landscaping; land level alterations; boundary treatment; private/communal/play space; refuse and cycle provision; demolition of single storey side conservatory extension and partial two storey side extension to the host property).
44 Clapham Common South Side London SW4 9BU
Discharge a Planning Obligation, Schedule 7, Paragraphs 1.a.i and 1.b of the S106 Agreement of the Planning Permission ref. 20/01436/VOC (Application under s 73 to vary condition 2 (Approved plans), condition 17 (materials), Condition 18 (construction detailing), Condition 26 (wheelchair accessible housing), Condition 37 (Bird and Bat Boxes), Condition 52 (vehicular access road), Condition 53 (Waste Transfer Unit Visibility Splays) of Planning Permission ref: 17/00605/FUL. Original description of development for 17/00605/FUL (as amended by application ref: 20/02186/NMC granted 24/07/2020): Demolition of the existing buildings and the re-development of the site incorporating the erection of six buildings comprised of basement and lower ground floor levels, ranging from four to 10 storeys above ground, landscaped gardens, public square, car parking and associated works; for a mixed use scheme comprised of a waste transfer facility at basement level, B1 office accommodation and A3 café; and the provision of residential units granted on 29.03.2018. Amendments sought include: Reduction in overall height in buildings A, B, C and D with exception of three areas - middle of building A, book end of building C and Building D, Rationalisation of the ceiling voids and reduction in floor to ceiling heights within all buildings to facilitate additional floors within buildings C, D, E and F, Relocation of 6 residential units from level 02 and 9 residential units from level 03 of building E, relocated to building C and D, Amendments to elevations and internal layouts of all buildings, Additional 4,429sqm flexible Office space (E(g)(i) created (Building E and F). Including plant on Building F relocated and replaced with additional floor for office use, Alterations and Extensions to Buildings E & F including extensions to floors 1-5, Site levels altered across, Basement reduced and Car parking spaces reduced from 38 to 32, Reduction in size of Waste Transfer fa)
13 Tindale Close South Croydon CR2 0RT
Discharge of condition 2 (tree protection) and 3 (construction logistics plan) of planning permission 18/04648/FUL for the erection of single/two storey front/side/rear extensions and alterations for subdivision into a pair of semi-detached dwellings.
11 Markham Road Luton LU3 2BS
Erection of a single storey side extension, erection front and rear dormers and alteration from hip to gable roof to facilitate loft conversion and construction of detached garage (Resubmission). Discharge of condition 6 (surfacing & Drainage) of planning permission 20/00370/FULHH dated 20th March 2020.
Lavendar Apartments 1A Mulgrave Road Croydon CR0 1BL
Discharge of Condition 11 - Construction Logistics Plan - attached to planning permission 20/05890/FUL for Erection of mansard roof over whole building to reconfigure 2 x studio flats, and provide 1 x 1-bed flat and 1 x studio. Erection of 4-storey rear extension converting 6 x studio flats into 3 x 2-bed flats and 3 x 1-bed flats. Erection of 4-storey side extension to provide 4 x studio flats, 1 x 1-bed and 1 2-bed flats (total of 8 additional flats) with external alterations revised landscaping and access. Provision of communal amenity space, refuse and cycle stores.