Bretton Hall Park Lane Bretton Wakefield WF4 4LG
Variation of condition 2 of approved application 16/016095/FUL dated 16th May 2017 (relating to approved application 12/01524/HYB dated 18th April 2013) (part detailed, part outline application for the re-development of former Bretton Hall campus. Detailed application: the conversion of the Mansion House to form a 120 bed hotel with ancillary restaurants, bar, spa, conference, wedding facilities and temporary marquee locations (C1) including erection of 3-storey extensions to the north and east wings and the partial demolition of later addition extensions to the Mansion and full demolition of Ezra Taylor, Alec Clegg, Victor Pasmore (including Music School and Dance Studio) buildings, Refectory, Student Services bungalow and hostel/ancillary buildings; conversion of the Camellia House to ancillary hotel use; conversion of the Stables, Coach House, Theatre, Gym, Library and link block to 7 office units (E(c)/E(g)(i)) and/or non-residential institutions (F1(a) F1(b)); erection of two 2-3 storey office pavilions (E(c)/E(g)(i) and/or non-residential institutions (F1(a) F1(b); and associated new access roads, car parking infrastructure and landscape works. Outline application: Erection of six 2 storey office pavilions (E(c)/E(g)(i) and/or non-residential institutions (F1(a) F1(b)). Application to amend some of the detailed drawings to which the application and approval relates
Heathlands West Land Off Neil Fox Way Wakefield
Non material amendment to approved application 19/01136/S7301 dated 25.03.2022 (Variation of Conditions 2 (Approved Plans), 8 (footpath link), 25 (Means of Access), 26 (Sightlines), 28 (Vehicles and Pedestrians) and 34 (Noise Mitigation) of application reference no: 19/01136/FUL Dated 19/10/2020 (Residential development 135 dwellings, associated car parking, garages; vehicular, pedestrian and cycle access and infrastructure; foul and surface water drainage infrastructure; public open space and landscaping, with vehicular access from Neil Fox Way) in order to allow for the substitution of house types and the delivery of 134 homes with a revised timetable for the delivery of the footway/cycle link to the Local Retail Centre) to vary the wording of condition 7 (restricting rate of development flow run-off from site) to allow a 1 in 1 year flow rate of 45 litres per second.