Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Land At Far End Boothby Graffoe Lincoln LN5 0LG
Application to discharge Conditions 2 (Tree/Hedge Protection Details), 3 (Materials), 4 (Planting Details), 5 (Hard Landscaping) and 9 (Bat Roost features) attached to application 17/1109/FUL - Demolition of dwelling, erection of replacement dwelling and construction of new garage
Witham St Hughs Phase III East Of Camp Road And North Of Hannah Crescent Witham St Hugh's Lincolnshire LN6 9GD
Application to discharge condition 3 (detailed masterplan), 4 (site phasing & infrastructure delivery plan), 5 (strategy of distribution), 8 (trees & hedgerows), 9 (tree protection scheme), 11 (landscape & ecology plan), 12 (surface water drainage scheme), 13 (existing & proposed site levels), 14 (foul water drainage strategy), 15 (timing of works for public highways), 16 (details of interface with A46 highway boundary), 19 (footpath upgrade scheme), 23 (construction management plan), 25 (land/contamination scheme), 26 (programme of works) & 29 (energy statement) of 15/1347/OUT - Erection of up to 1,100 dwellings and 150 care/retirement units (C2/C3), the formation of a roundabout to Camp Road, A46 junction improvement works, public open spaces and associated service infrastructure (outline with means of access)