45 Washingborough Road Heighington Lincoln Lincolnshire LN4 1QW
Application to discharge conditions 3 (boundary treatments), 4 (arboricultural method statement), 6 (soft landscaping), 7 (external lighting), 8 (bird & bat boxes), 9 (Construction Method Statement) & 10 (hard & soft landscaping) attached to planning permission 21/0332/FUL - Erection of three residential dwellings with associated access road and landscaping and including alterations to 45 Washingborough Road (Resubmission of 20/1654/FUL)
Bloxholm Farm North End Farm Bloxholm Lane Digby Lincoln Lincolnshire LN4 3QF
Application do discharge Condition 3 (Schedule of Materials), Condition 6 (Soft Landscaping Plan), Condition 8 (Boundary Treatments) and Condition 10 (Arboricultural Method Statement) attached to planning permission 20/0528/FUL - Construction of agricultural workers dwelling in connection to the adjacent Poultry Rearing Farm (resubmission of 17/1474/FUL).
Dorrington Farm Dorrington LN4 3BQ
Application to discharge conditions 2 (Schedule of Materials), 6 (Soft Landscaping Plan), 8 (Boundary treatments) & 10 (Arboricultural Method Statement) attached to planning permissionb 20/0531/FUL - Construction of an Agricultural Workers Dwelling in connection to the adjacent Poultry Rearing Farm (resubmission of 17/1442/FUL).
Land Off Banks Lane Heckington Sleaford NG34 9QY
Application to discharge conditions 2 (materials), 3 (timber window & door details), 4 (boundary treatments), 7 (landscaping) 9 (ecology), 10 (lighting scheme for bats) and 14 (construction management plan) attached to planning permission 17/1593/FUL - Application for the demolition of existing house and dance studio (15 Banks Lane) and bungalow (5 Banks Lane) and the erection of 3 two-storey dwellings and 1no cottage with 1st floor dormer accommodation
Witham St Hughs Phase III East Of Camp Road And North Of Hannah Crescent Witham St Hugh's Lincolnshire LN6 9GD
Application to discharge condition 3 (detailed masterplan), 4 (site phasing & infrastructure delivery plan), 5 (strategy of distribution), 8 (trees & hedgerows), 9 (tree protection scheme), 11 (landscape & ecology plan), 12 (surface water drainage scheme), 13 (existing & proposed site levels), 14 (foul water drainage strategy), 15 (timing of works for public highways), 16 (details of interface with A46 highway boundary), 19 (footpath upgrade scheme), 23 (construction management plan), 25 (land/contamination scheme), 26 (programme of works) & 29 (energy statement) of 15/1347/OUT - Erection of up to 1,100 dwellings and 150 care/retirement units (C2/C3), the formation of a roundabout to Camp Road, A46 junction improvement works, public open spaces and associated service infrastructure (outline with means of access)