34 Acre Lane London Lambeth SW2 5SG
Application for a non-material amendment following a grant of planning permission ref: 20/01214/FUL (Change of use/refurbishment of the building from retail (Use Class A1) to 9 residential units (Use Class C3) to provide 8 x 2 beds and 1 x 3 bed, including basement excavation and erection of a mansard roof; plus the retention of part of the ground floor retail unit (Use Class A1), together with provision of cycle and refuse stores, amenity areas, landscaping and other associated alterations) granted on 13.08.2021.
154-166 Clapham High Street And 162 Stonhouse Street London SW4
Application for a non-material amendment following a grant of planning permission under ref 18/01832/FUL (Retention of ground floor commercial units, part change of use from Use Class A1 (shops) to use Class C3 (residential) on upper floors and part of ground floor (rear part), and alterations including excavation to form a basement to Nos. 156-158 Clapham High Street, the demolition of existing 1-3 storey rear extensions and erection of replacement part 3 part 4 rear and side extensions to provide 28 residential units (Use Class C3) with shared amenity space, landscaping and associated works), granted on 27.11.2020 and a variation of Condition 2 (approved plans) granted planning permission granted on 10.11.2021 under ref: 21/00200/VOC.
Vauxhall Bus Station Bondway London
Application for a non-material amendment following a grant of Planning Permission ref : 17/04741/FUL (Redevelopment of the site involving demolition of existing bus station and erection of a 3 storey building at the northern end for bus-related operational use with part retail (Use Class A1) at ground floor level, and a single storey building at the southern end for bus-related operational use. Installation of main bus station canopy; new and replacement bus shelters; alterations to existing vent shaft and lift shaft; installation of pissoir, temporary kiosk and associated works) granted 09/02/2018. Amendment sought: Phase the development into Phase 1 and Phase 2 works Amend wording to Conditions 18 (NRMM), 19 (Construction Management Plan), 20 (Temporary Bus stops) and 28 (Tree Protection) to allow for Phase 1 works to commence prior to their discharge