104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
66 Clonmel Road London SW6 5BJ
Erection of a front and rear roof extension; erection of a single storey rear extension, to the side and rear of existing back addition following the demolition of existing conservatory; installation of a new window to replace existing to the rear elevation at second floor level; installation of a new window to replace existing to the side elevation at first floor level; infilling of a window to the side elevation at first floor level; installation of a new door and windows to replace existing, to the front elevation at first floor level; installation of a new main front entrance door to replace existing; alterations to the front boundary wall to include erection of painted brickwork and iron railings on top; excavation of front garden and part of rear garden to form lightwells, in connection with the enlargement of the existing basement; removal of trees T3 and T4 in the rear garden.