63 Gordon Road Ealing W5 2AL
Submission of the Tree Monitoring Plan pursuant to condition 11 of planning permission 222241FUL dated 19.04.2023 for 'Conversion of 2 self-contained flats into 7 self contained flats, part single/part two storey rear extension, with balconies at first and second floor level, creation of a basement level; alterations to the main roof profile, removal of side/rear dormer, two rear dormer windows with integrated terrace, installation of four rooflights to front roof slope, replacement of existing windows and doors, associated amenity space, landscaping, refuse storage, and parking spaces'
8 Heathfield Road Acton W3 8EL
Details of Tree Protection Plan (Demolition & Construction) pursuant to condition 10 of planning permission ref: 213371FUL dated 09/02/2022 for: Conversion of existing building from 3 self-contained into 5 self-contained flats following single storey side/rear (wraparound) extension; extension to existing basement; part rear extension to first floor; alteration of roof from hip to gable end (following removal of side dormer extension and chimney); reconfiguration of the layout of all flats; alteration to existing rear dormer extension to roof second floor terrace installation of rear dormer roof extension to second floor flat; replacement of existing front rooflight with conservation type of rooflight, replacement of all windows and door in timber, refurbishment of existing facade and replacement of existing side gate; associated landscaping, bin storage, bicycle parking, amenity space along with proposed paving and part raised platform to rear of property, following demolition of existing outbuildings
8 Heathfield Road Acton W3 8EL
Details of Tree Monitoring Plan pursuant to condition 11 of planning permission ref: 213371FUL dated 09/02/2022 for: Conversion of existing building from 3 self-contained into 5 self-contained flats following single storey side/rear (wraparound) extension; extension to existing basement; part rear extension to first floor; alteration of roof from hip to gable end (following removal of side dormer extension and chimney); reconfiguration of the layout of all flats; alteration to existing rear dormer extension to roof second floor terrace installation of rear dormer roof extension to second floor flat; replacement of existing front rooflight with conservation type of rooflight, replacement of all windows and door in timber, refurbishment of existing facade and replacement of existing side gate; associated landscaping, bin storage, bicycle parking, amenity space along with proposed paving and part raised platform to rear of property, following demolition of existing outbuildings