The Charter House London Road Coventry CV1 2JR Coventry
Variation of condition 2 (to amend drawings to enable alterations to the wall finishes to the Medieval corridor known as reference G09, enhancements to the display of the existing second floor Medieval roof beams, and amendments to the location of the supporting beam for the fire shutter in the areas known as reference G01/G17) imposed on application reference FUL/2017/3074, granted on 27th February 2018 for the erection of single storey front extension.
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.
Sandy Lane Business Park Unit 3 & 4 Sandy Lane Coventry CV1 4DQ Coventry
Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.)