Camilla Lacey 7 Hillwood Close Hutton Brentwood Essex CM13 2PE
Discharge of conditions 3 (Details of materials), 4 (Construction Method Statement), and 5 (Landscaping Scheme) of application 19/01302/FUL (Demolition of existing dwelling and erection of new dwelling and outbuilding and associated landscaping works).
Land At Red Rose Farm Red Rose Lane Blackmore Ingatestone Essex CM4 0SA
Discharge of condition 24 (Detailed Remediation Scheme) of application 19/01013/FUL (Demolition of existing buildings; and erection of 12 dwellings (to include 4 affordable dwellings), associated infrastructure including landscaping, utilities and drainage infrastructure).
Land At Red Rose Farm Red Rose Lane Blackmore Ingatestone Essex CM4 0SA
Discharge of conditions 17 (Maintainence plan) of application 19/01013/FUL (Demolition of existing buildings; and erection of 12 dwellings (to include 4 affordable dwellings), associated infrastructure including landscaping, utilities and drainage infrastructure).
Land At Red Rose Farm Red Rose Lane Blackmore Ingatestone Essex CM4 0SA
Discharge of conditions 24 (Detailed Remediation Scheme) of application (Demolition of existing buildings; and erection of 12 dwellings (to include 4 affordable dwellings), associated infrastructure including landscaping, utilities and drainage infrastructure).
Land At Red Rose Farm Red Rose Lane Blackmore Ingatestone Essex CM4 0SA
Discharge of condition 3 (Samples of materials), 4 (Surfacing materials), 5 (Scheme of soft landscaping), 6 (Details of treatment of boundaries, gates, fences etc), 7 (Additional drawing of windows, doors eaves etc), 8 (Existing and proposed site levels), 9 (Details of position of refuse storage), 16 (Surface water and drainage scheme), 19 (Programme of Archaeological Evaluation), 20 (Summary report and mitigation strategy), 21 (Completion of archaeological evaluation), 22 (Post Excavation Assessment), 23 (Contamination Report), 24 (Detailed Remediation Scheme), 27 (Monitoring and Maintenance Scheme), of application 19/01013/FUL (Demolition of existing buildings; and erection of 12 dwellings (to include 4 affordable dwellings), associated infrastructure including landscaping, utilities and drainage infrastructure).